采购或生产制造开始之前,合同专业检验试验计划(itp)应充分明确检查、无损检验(nde)和性能试验介入点。
Prior to procurement or commencement of manufacture, the inspection, NDE and performance testing intervention points shall be adequately defined in a contract specific inspection and test plan (ITP).
经核准的检验试验计划(ITP)由生产工程部(PED)发放至所有部门,以便在生产制作期间,确定内部检验和客户检验要求。
The approved ITP will be issued by PED to all departments so that internal and client inspection requirements are identified during manufacture.
经核准的检验试验计划(ITP)由生产工程部(PED)发放至所有部门,以便在生产制作期间,确定内部检验和客户检验要求。
The approved ITP will be issued by PED to all departments so that internal and client inspection requirements are identified during manufacture.