方案1a.检查进度条的状态。
检查进度的一个办法是在每一个设定的阶段记下自己的成绩。
One way to measure your progress is to document your performance at set intervals.
代码清单1中代码所示的 checkProgess_status()函数会检查进度条的状态。
The checkProgess_status() function shown in the code in Listing 1 checks the show state of the progress bar.
我们会提供书本,并且每周设置测试来检查你的进度。
We provide books, and we set tests every week to check your progress.
制定计划后,您需要一种方法来针对该计划监控进展,即检查实际进度的日期是否与计划一致。
Once a plan is developed, you need a way to monitor progress against the plan. That is, to check whether the actual progress to date corresponds with the plan.
在某些情况下,这就像是进度检查,而且既不正式也不规律,天天总围着办公室转。
In some cases, this may mean nothing more than an occasional, informal progress check while making the rounds of the office.
可以通过很多方式对信息进行记录(例如,按命令记录或全盘记录),并检查和报告进度。
You can log the information in many ways, for example, on a command-by-command or global basis, and check and report on the progress.
在你检查员工进度之前,你必须决定成功实现目标的关键指标有哪些。
Before you can check your employees' progress, however, you've got to determine the key indicators of a goal's success.
检查和理解进度问题。
还应该有正式的遵从性标准和相关检查表,以便将进度从流程的一个部分引领到另一个部分。
There should be formal compliance criteria and related checklists that gate the progression from one part of the process to the next.
检查任务1.1时,你会马上意识到虽然你的项目进度计划中并没有用图示标明,但是这个任务同一个更早的任务2.1之间存在依赖关系。
Having examined task 1.1, you would immediately realize that although this is not graphically marked in your project schedule, there is a dependency between this task and an earlier task 2.1.
在这种情况下,这个组织可以使用一个简单进度检查列表来控制这些机制和主动性工作。
In such a case, the organization could use a simple progress checklist to exercise control over the mechanisms and initiatives.
计划 ——定义项目战略,包括开发和交付项目计划、计算总规模和各个部分的规模、定义工作进度表和为主要检查点建立里程碑。
Planning - Define a strategy to develop and deliver a project plan, calculate overall and detailed sizing, define a work schedule, and establish milestones for major checkpoints.
在开始进行详细的架构和设计工作之前,让我们来检查一下ASDI项目的整体进度。
Before launching into the details of the architecture and design efforts, let's review the overall progress of the ASDI project.
这个系列的第5部分首先检查了一下项目的时间进度,然后当我们进入了架构、设计、数据建模和创建原型时,我们已经在下一个阶段进行细化阶段中了。
This Part 5 installment first reviews the project to date and then elaborates on the next stage, as we move forward into architecture, design, data modeling, and prototyping.
你会检查关键路径上的每一格活动,并识别可能破坏进度的风险。
You will review each of the activities on the critical path and identify the potential risks that could put your schedule in jeopardy.
他对产品的要求是符合公司总体的业务策略,他还对该系统提出了一个远景概述,7每周五他还是公司项目进度检查组的一员。
He has the vision for the product as it fits into the company's overall business strategy, and he provides a vision statement for the system 7 and is part of the company's review team every Friday.
在迭代测试中,我们因此根据处于不同环境中的客户来同时确定商业使用模型检查和系统测试活动的时间进度。
In iterative testing, we therefore schedule both business usage model reviews and system testing activities with customers whose environments differ.
l个人监督:你可以去看看自己的员工,定期检查一下他们的进度。
Personal follow-up: Personally visit your employees and check their progress on a regular basis.
当您已经为执行步骤做好准备时,点击ApplyResultforStep1完成检查,而且执行进度条会移动至50%(图27)。
When you are ready to execute a step, click the Apply Result for step 1 gets checked off, and the execution progress bar moves to 50% (Figure 27).
一个月过去了。玛德琳依然很勤奋。她每天晚上浇水,希望第二天早上能看到长出的胡萝卜。每天早上她都会检查它们的生长进度。
A month went by. Madeline remained diligent. She watered every night, hopeful there'd be carrots in the morning. Every morning she would check their progress.
在这段被安全委员会形容为“聚精会神的讨论”过程中,两位飞行员都没有监控飞机的飞行进度,也没有检查地面塔台的通信。
During what the safety board described as a 'concentrated period of discussion' neither pilot monitored the progress of the airplane nor air-traffic control communications.
买方保留检查供应商履行销售合同进度状况和是否正确履行的权利。
The buyer reserves the right to check or have checked the state of progress and correct performance of the purchasing contract by the supplier.
然后,让他或她检查每日更新进度。
Then, ask him or her to check in with you for daily updates on your progress.
观念,物理特性,建模,进度检查。
第二百七十七条发包人在不妨碍承包人正常作业的情况下,可以随时对作业进度、质量进行检查。
Article 277: the employer may inspect the progress and quality of work at any time, provided that the same does not hinder the normal work of the contractor.
第二百七十七条发包人在不妨碍承包人正常作业的情况下,可以随时对作业进度、质量进行检查。
Article 277: the employer may inspect the progress and quality of work at any time, provided that the same does not hinder the normal work of the contractor.