就如何控制梁板预制的蒸气养护温度进行了阐述。
The paper expounds the controlling methods of steam maintenance temperature for beam slab precasting.
分析预制混凝土梁(板)在施加预应力时质量缺陷的原因及其对策。
The paper analyzes reasons for quality defects as the precast girder is prestressed and raises strategies for them.
结合工程实例介绍了装配式预应力空心板梁的集中预制的施工组织及工艺流程。
Combined with the engineering practice discussion is made on the construction technology and the process for the centralized prefabrication of prefabricated prestressed hollow girder beam.
使用预制钢筋混凝土梁或者现浇钢筋混凝土板会很容易将两侧地下连续墙的跨度空间连接起来,从而完成隧道的主壳。
The span between two such diaphragm walls can easily be bridged with precast reinforced concrete beams or a cast in-site reinforced concrete slab to complete the main shell of the tunnel.
空心板梁预制采用整体式拼装模板,预制场内集中预制,平板车拉运,吊车安装。
Spatial core Liang prefabricates USES the integral-type assembling template, prefabricates in the field to concentrate the prefabrication, the flatbed transports by cart, crane installment.
公路桥梁预制钢筋混凝土板梁施工中,底模的制作及脱模是关键。
Fabricating and demoulding of the base mould is a key during the course of construction for precast plate girder of highway bridge.
介绍高桩梁板码头拆除方案的设计及施工,重点分析岩质海岸地质条件下预制桩的拆除方案。
This paper describes the design and construction of the demolishing scheme of the high-piled wharf, and analyzes mainly the demolishing scheme of precast piles under rocky coast.
介绍高桩梁板码头拆除方案的设计及施工,重点分析岩质海岸地质条件下预制桩的拆除方案。
This paper describes the design and construction of the demolishing scheme of the high-piled wharf, and analyzes mainly the demolishing scheme of precast piles under rocky coast.
应用推荐