• 介绍了筋,混凝土浇注加固施工工艺

    Constructional technology of welding concrete steel under the beam and strengthening with concrete cast are introduced.

    youdao

  • 碳纤维可以有效改善裂缝分布形态

    The configuration of crack in the beam's bottom could be markedly improved.

    youdao

  • 认为一定锚固预应力作用下,反力沿二次抛物线分布直线均匀分布

    It is put forward that under a definite prestressed force, the distribution discipline of the counterforce along the length of beam is quadratic parabola rather than linear or uniform one.

    youdao

  • 拉杆体系中,梁底预应力非预应力成为主要受拉部分,拉杆上方成为应力

    In this system, the steel wires and steel bars are the main parts that bear the tensile force, the stress in the district above the dragging bar is low.

    youdao

  • 此时转换则在较小区域内承受集度较大竖向力,受力变得不利,容易集中出现较大应力

    At this point conversion, beam bear a greater vertical force, the bottom of beam appears large tensile stress easily. The conversion layer slab with upper wall appears stress concentration easily.

    youdao

  • 目前可供选择方案国外使用较多的驮式运管承式运管车。

    There are two schemes to be chosen, one is transport vehicle with packing beam, which is very popular worldwide, the other is the transport vehicle.

    youdao

  • 最后在垂直于其跨度方向上肋相对位移的数据进行了分析,这种肋顶和肋的相对位移受扭产生的。

    Finally, torsion rule of ribs is been found through anglicizing the relative data of displacement, which is caused by torsion of tip and bottom of ribs.

    youdao

  • 介绍了多晶莫来石纤维组合步进式加热炉使用效果

    This paper introduces the application effect of multicrystal mullite refractory fiber in walking furnace with unity of beam and bottom.

    youdao

  • 采用现代设计方法有限元技术,应用i - DEAS软件电除尘结构的主要尺寸参数进行了质量目标函数评估优化

    By means of I-DEAS software, taking quality as object function, this paper evaluates and optimizes the dimension parameters of mid-mudsill steel structure of an electrostatic precipitator.

    youdao

  • 公路预制钢筋混凝土施工制作脱模关键

    Fabricating and demoulding of the base mould is a key during the course of construction for precast plate girder of highway bridge.

    youdao

  • 船体上甲板,顶边,斜边双层组成。

    The main hull girder to consist of upper deck, topside tanks, hopper tanks and double bottom.

    youdao

  • 通过工程实例剖析,介绍注浆扩大承台()法等桩基事故处理方法原理,作为工程实践经验的总结。

    Through the analysis of pile bottom grouting and beam expanding accident methods and principles, the engineering practical examples are summarized.

    youdao

  • 通过之间弹性顶力定位打磨位置倾斜扶手的同时实现打磨。

    Through elastic beam between the hands and mudsill positioning grinding location, even in inclined handrails, grinding is realized.

    youdao

  • 夹持机构含有结构件主体(1)通 过弹性连接的结构件(2),其中结构件主体(1)附加镜片相连, 结构件(2)设有至少一个通过机械运动夹持镜中的所机械 钩。

    The organization includes the principal part1, the part2 that is connected to part1 by elasticity. The part1 is linked with the additional lens, and the part2 has at least one clip mentioned above.

    youdao

  • 结果表明:岩两侧存在流变,虽然其大致规律相似,但存在明显差异

    It was shown that there were significantly different rheological deformations on top and bottom of rock beams with broadly similar regulation.

    youdao

  • 结果表明:岩两侧存在流变,虽然其大致规律相似,但存在明显差异

    It was shown that there were significantly different rheological deformations on top and bottom of rock beams with broadly similar regulation.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定