• 介绍了利用线路平面控制控制道路工程组合曲线中线桩点位的坐标计算、测设方法

    A method for calculating and measuring the coordinates of centering stakes using line control counts in plane control meshwork is introduced in highway construction in this paper.

    youdao

  • 根据道路设计信息推导出线路坐标系下任意中坐标计算公式横断面方位角,由计算得到的横断面方向指导野外GPS断面测量

    Based on road design information, we derived coordinates of arbitrary points in the pile and cross-sectional azimuth which may guide global positioning system (GPS) surveying in section surveys.

    youdao

  • 不到早晨便到了滨海蒙特勒伊第一事便是把寄给拉特先生的送到邮局,疗养室去芳汀

    A little before six o 'clock in the morning he had arrived at M. Sur m., and his first care had been to post a letter to M. Laffitte, then to enter the infirmary and see Fantine.

    youdao

  • 提出一种无需放样路线的中无需测定横断面方向导线上直接放样路线边线方法

    A new method which neither center stakes nor cross - sectional directions about route layout side slope stakes from traverse stations, is discussed in this paper.

    youdao

  • 结构能够承受最大弯矩不为负值作为限制条件,得出安全作业跨距和倾角参数控制曲线

    With the limitations of the maximal bearable bending moment and the positive lifting force, the controlling parameter curves of span and lifting Angle are then acquired to guide the safety operation.

    youdao

  • 信号奇异位置很容易确定入射缺陷反射波、底反射波位置。

    Then the incident wave, pile-toe reflection wave and flaw reflection wave can be judged by the position of singularity.

    youdao

  • 提出种在导线上直接放样路线无需放样路线方法生产实践中好的效果。

    A method of route surveys from traverse stations, without need of center line, is put forward. It demontrates high efficency in practice.

    youdao

  • 根据钻孔灌注施工工艺主要论述了道工序质量控制

    Based upon the construction technology of cast in place bored piles the quality control of every procedure is mainly discussed.

    youdao

  • 一般认为锚杆)抗滑锚杆(索)拉力、滑坡推力前滑体抗力作用下绕锚固(锚拉力作用)保持力矩平衡,锚固铰支

    It is a balance system that the anti-slide pile is exerted by three kinds of force, they are the tensile force of anchor, the thrust of sliding mass, the resistance of soil and rock.

    youdao

  • 应力最大发生处,随着荷载增加而向上移动

    At certain point under the pile the stress come to the maximum and it will move upwards along the pile with the load increasing.

    youdao

  • 根据充电法原理,结合模型试验,分析钢筋周围充电电场特征,结果表明钢筋笼底端对应电位梯度曲线极小值及电位曲线的拐

    Tests reveal that the bottom of the reinforcement cage corresponds to the minimum of the electric potential gradient curve and the inflexion of the electric potential curve.

    youdao

  • 然后根据奇异位置确定入射缺陷反射波、底反射波位置

    Then, the positions of the incident wave, pile-toe reflection wave and flaw reflection wave can be determined by the position of singular point.

    youdao

  • 基坑西侧支护体系累计位移

    The accumulative total displacements at the measuring points on the base top and pile top are somewhat high.

    youdao

  • 一般文献给出布设是以吊索等长为前提的。

    The arrangement of four lift points to hoisting a pile, as given in general technical literature, is on the premise of slings with equal length.

    youdao

  • “吹糠见米”现实主义,等于眼前的把稳事情

    The concept of 'blow the chaff and see rice' (make some easy money) is realist, equivalent to 'holding tight while taking a shit', or doing a sure thing.

    youdao

  • 揭示工序控制保证钻孔灌注施工质量基本

    Author points out that the procedure control is the foundation of construction quality for cast in place bored piles construction.

    youdao

  • 儿挪动,一直爬围着自家空地篱笆边。

    He worked his way to the white picket fence bordering their lot.

    youdao

  • 然后根据导线进行道路设,同时进行测量。

    The second , the surveys of the road′s middle pile are measured in line with the line′s points then the surveys of horizonal mid

    youdao

  • 控制标志设置采用强制观测普通标石相结合方式

    The control point symbolized the establishment used the deep pile to force to the center to observe the way which the pillar and the ordinary monument unified;

    youdao

  • 现场试验包括:①测定冲器水平动力作用产生地面加速度以及引起的地面加速度距离之间的关系;

    The in-situ measurement includes:( 1 ) the ground acceleration due to horizontal vibrating force caused by the vibroflot and its variation with the distance from the vibrating center;

    youdao

  • 他们早上丹耽陛肥堵标瑟钵鸡来吗?。

    Do they get up at six in the morning?

    youdao

  • 结合某一具体工程实例,给出了从井降水、素混凝土的浇筑到钻孔注浆过程中的具体施工方法参数选择

    Based on practical project, this paper listed the implement method of well precipitation, native concrete picket, liquid grouting and the choice of parameter. The result prove...

    youdao

  • 各段挠曲方程的解以后,可以用求导方法求出双排变形内力情况

    After fetching each deflection equations, the situation of deformation and internal forces can be achieved.

    youdao

  • 各段挠曲方程的解以后,可以用求导方法求出双排变形内力情况

    After fetching each deflection equations, the situation of deformation and internal forces can be achieved.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定