• 延迟策略作用发挥前提条件产品设计开发高效性生产运作体系高度柔性

    The essential prerequisite of giving full scope to postponement is the high efficiency of product development and design and high flexibility of production operation system.

    youdao

  • 介绍基于投标柔性生产线方案设计设计步骤提出柔性生产线方案设计报价系统体系结构

    This paper presents the steps of bidding based flexible transfer line schematic design. The architecture of the flexible transfer line schematic design and quoting price integrated system is proposed.

    youdao

  • 介绍基于投标柔性生产线方案设计设计步骤提出柔性生产线方案设计报价系统体系结构

    This paper presents the steps of bidding based flexible transfer line schematic design. The architecture of the flexible transfer line schematic design and quoting price integrated system is proposed.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定