聪明的是枢纽工程的设计者。
The real smart people are the designers of this water conservancy project.
为万家寨水利枢纽工程和引黄工程龙头所在地。
For Wanjiazhai Yellow River Water Control project and the location of the project leader.
简要介绍湘江大源渡枢纽工程的规模、进展及效益。
The scale, progress and benefit of Xiangjiang Dayuandu Junction Project are briefly introduced.
升船机是三峡水利枢纽工程的主要通航建筑物之一。
The ship lift is one of the navigation facilites of the Three Gorges Project on the Yangtze River.
三峡工程是中国、也是世界上最大的水利枢纽工程。
The Three Gorges Project is the biggest project of irrigation works hinge either in china or in the world.
喀什河渠首枢纽工程是在林公渠的基础上建造起来的。
The Kashi River canal headwork was built on the basis of the Lingong canal.
万家寨水利枢纽是黄河中游干流上的大型水利枢纽工程。
Wanjiazhai hydro project is a large hydro project on the middle trunk stream of Yellow River.
尼尔基水利枢纽工程渗流稳定分析简化为平面稳定渗流。
The stability analysis in Nierji Project is simplified as the plane seepage analysis.
幸亏有世界银行资助的一项水利枢纽工程,咸海的北端将被保留下来。
Thanks to a World Bank-funded dam project, the sea’s northern tip will be preserved.
对红山窑水利枢纽工程中的风化红砂岩进行膨胀特性试验研究。
The expansive properties of the weathered red sandstone in Hongshanyao Hydro Project are studied by experiments.
砂层震动液化问题是哈达山水利枢纽工程首要的工程地质问题。
Shock liquefaction of sand layers is a principal engineering geological problem for the Hadashan water conservancy project.
尼尔基水利枢纽工程主坝结构形式为沥青混凝土心墙砂砾石坝。
The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.
泄水建筑物的磨蚀问题是万家寨水利枢纽工程的主要技术问题之一。
The abrasion of water release structure is one of the main technique problems on the Wanjiazhai Hydroproject.
小浪底水利枢纽工程专用通信网的无线系统是有线系统的延伸和补充。
The radio system of the Xiaolangdi Project is the extension and supplement of the wire system for the special communication network.
松花江大顶子山航电枢纽工程的建设,为沿江地带开发和振兴带来机遇。
The Dadingzi hill hub electric project of Songhua River brings a historic opportunity for the development and revitalization of areas along the river.
西陵长江大桥为三峡水利枢纽工程前期准备工程中的一项重要的交通设施。
Xiling Yangtze River Bridge is one of the important traffic facilities for preparation of the Three-Gorge Water Conservancy Key Project.
大跨度桥梁通常是交通运输系统的枢纽工程,是生命线工程的重要组成部分。
It is well know, in general, that the long - span bridge is the hinge of transportation system and the important component of lifeline project.
水利枢纽工程建设弃土弃渣的妥善处理是防治工程建设水土流失的关键之一。
The proper treatment of dregs from the construction of water control project is the key to prevent soil and water losses of project construction.
倒垂线作为大型建筑物变形监测的基准设施,广泛应用于大型水利枢纽工程中。
The inverted perpendicular, being a deformation monitoring datum with large-scale building, is widely applied to the water resource projects.
长江三峡水利枢纽工程以规模巨大、项目专业深广、施工技术复杂而举世瞩目。
Three gorges hydro project on the Changjiang River attracts worldwide attention for its huge-scope, depth and width in specialties and complexity of construction technique.
结合辽河石佛寺水库枢纽工程,阐述了液压滑模机在混凝土工程施工中的应用。
The application of hydraulic pressure slip model in reservior pier concrete construction is discussed through Liaohe Shifesi hinge reservoir project.
紫坪铺水利枢纽工程位于四川省西部的岷江上游,映秀至都江堰市沙金坝河段上。
Zipingpu Multi-purpose Dam Construction Project is located at Yingxiu-Dujiangyan reach, upstream of Minjiang river, west Sichuan.
老口枢纽工程上坝址主要的工程地质问题为坝址基岩岩性较软,抗剪强度、承载力偏低。
The major engineering geological problems of US dam site of Laokou Complex include relatively soft base rock lithology, low shear strength and bearing capacity.
本文阐述了葛洲坝水利枢纽工程截流后,宜昌江段铜鱼产卵场的分布和规模及其繁殖条件。
This paper elaborates the distribution and scale of spawning grounds and the reproductive conditions of Coreius heterodon in Yichang Section after damming by Gezhouba water conservancy pivot.
施工导流是水利枢纽工程总体设计的重要组成部分,直接关系到工程总进度和工程总造价。
Construction diversion is important component of comprehensive design in water conservancy projects and has direct relationship with the whole engineering schedule and cost.
进而扼要阐述了小浪底枢纽工程的总体布置方案,设计规模,工程效益与建筑物设计特点等。
The general layout of Xiaolangdi Project, designed size, benefits and particulars related to the design of structures are also treated of.
介绍了峡口水利水电枢纽工程技施设计阶段坝基开挖线、拱坝坝型和拱坝体型优化设计成果。
The optimization design results of the dam base excavation outline and the type and body shape of the arch dam of the Xiakou Hydraulic Project are introduced.
介绍了峡口水利水电枢纽工程技施设计阶段坝基开挖线、拱坝坝型和拱坝体型优化设计成果。
The optimization design results of the dam base excavation outline and the type and body shape of the arch dam of the Xiakou Hydraulic Project are introduced.
应用推荐