因此,研究雨水管网的可靠性,采取基于可靠性理论的概率极限状态设计法来设计雨水管网有着重要的实际意义。
So studying reliability of rainwater pipe network and adopting probability limit state design method based on reliability theory to design rainwater pipe network have important actual meanings.
并通过非线性有限元模拟分析,给出了细长钢筋混凝土压杆的极限承载力表达式以及由此确定的双控设计法。
The simulated ultimate load formula and double-control design method of slender eccentrically compressed reinforced concrete member were proposed by nonlinear finite element simulation analysis.
接屈服线法或条带法的极限荷载设计不能完全保证抗裂或防止过度变形。
Ultimate load designs according to the yield-line or strip methods do not guarantee safety against cracking or excessive deformation.
并通过非线性有限元模拟分析,给出了细长钢筋混凝土压杆的极限承载力表达式以及由此确定的双控设计法。
The simulated ultimate load formula and double-control design method of slender eccentrically compressed reinforced concrete member were proposed by nonlinear fi...
以钢结构设计原理中的极限状态设计法或容许应力法为基础,阐述了预应力加固钢结构的分阶段加固设计计算原理和方法。
Based on limit-state design method in steel structure design principle, the principle and method of phased strengthening design of steel structures strengthened by prestressing is represented here.
当前的工程结构设计,在国内的结构设计规范中,多已采用以概率理论为基础的极限状态设计法。
Most of recent domestic design codes of engineering structures have adopted the Probability-Based Limit State design Method.
引入概率的极限状态设计概念,研究JC法推求梯级水库设计洪水的理论。
The probabilistic design conception on limit state was introduced, and the theory using the JC method to compute the cascade reservoir's design flood was studied.
介绍了概率极限状态设计法在确定地基承载力中的应用,可供工程实践之参考。
The application of probabilistic limit state method in confirming the bearing capacity of foundation soil is introduced. It can be used as reference in engineering application.
并通过非线性有限元模拟分析,给出了细长钢筋混凝土压杆的极限承载力表达式以及由此确定的双控设计法。
The simulated ultimate load formula and double-control design method of slender eccentrically compressed reinforced concrete member were proposed by nonlinear finite element simulation...
当滑坡设计安全系数较小时,岩土体抗滑强度未得到充分发挥,有限元与极限分析法有一定差距;
When the pile design safety factor is small, the anti-slide strength of rock and soil is not fully exerted. The finite element method has some discrepancy with the traditional method.
当滑坡设计安全系数较小时,岩土体抗滑强度未得到充分发挥,有限元与极限分析法有一定差距;
When the pile design safety factor is small, the anti-slide strength of rock and soil is not fully exerted. The finite element method has some discrepancy with the traditional method.
应用推荐