• 本文连续介质力学理论探讨条带法开采合理条带尺寸

    The proper size of coal pillars and mining width for partial mining are studied with theory of continuum mechanics.

    youdao

  • 接屈服线条带极限荷载设计不能完全保证抗裂防止过度变形

    Ultimate load designs according to the yield-line or strip methods do not guarantee safety against cracking or excessive deformation.

    youdao

  • 有限横向条带构造了组合结构极段考虑局部屈曲空间位移模式。

    A space displacement field considering the deck local buckling for the plate - truss composite is constructed by using transverse finite stripe.

    youdao

  • 本文通过相似材料模型试验探讨条带法开采条带煤柱支撑状态地表移动问题

    Modelling tests are made to study problems of supporting state of coal pillar together with characteristics of overlying strata and surface movement in partial mining in this paper.

    youdao

  • 本文通过相似材料模型试验探讨条带法开采条带煤柱支撑状态地表移动问题

    Modelling tests are made to study problems of supporting state of coal pillar together with characteristics of overlying strata and surface movement in partial mining in this paper.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定