在作业成本法中,以下哪一个是把材料处理成本分配到已完工产品中的合理基础?
Which of the following would be a reasonable basis for allocating the material handling costs to the units produced in an activity-based costing system?
在作业成本法中,以下哪一个是把材料处理成本分配到已完工产品中的合理基础?
Which of the following would be a reasonable basis for allocating the material handling costs to the units produced in an activity-based costing system?