重点介绍机械设备布置、温度及应力应变测点布置、混凝土分层分段整体浇筑等技术措施。
The arrangement of machine, equipment and monitoring points of temperature, stress and strain, the technology of layered and segmented integral pouring are introduced in detail.
阐述了消减机械振动的参数选择、支承布置及振动源的处理措施,以期改善设备动态特性、合理设计和使用机械设备。
Reducing vibration parameter selection, support distribution and dealing with vibration source are elaborated for improving dynamic character and reasonable design and use of machinery equipment.
阐述了消减机械振动的参数选择、支承布置及振动源的处理措施,以期改善设备动态特性、合理设计和使用机械设备。
Reducing vibration parameter selection, support distribution and dealing with vibration source are elaborated for improving dynamic character and reasonable design and use of machinery equipment.
应用推荐