标准生产能力通常表达为机器工时、直接人工成本、直接人工工时等指标。
The productive capacity is usually expressed in terms of an activity base, such as machine hours, direct labor cost, or direct labor hours.
在一台机器上使用数种刀具来顺次或同时进行几项机器操作,将节省大量加工时间。
It will save considerable machining time to use more than one tool in one machine to perform several machine operations either in sequence or simultaneously.
机器开始以最大速度运行来减少非加工时间,但当他达到数据定义的位置时,机器开始减速。
The machine moves initially at maximum velocity in order to reduce nonproductive time but decelerates as the tool reaches its numerically defined position.
这使机器的停工时间降到最低程度,在改变规格的生产中也能做到这一点。
This leads to minimized downtime of the machine, even when production changes are performed.
提出并研究两台机器环境下的以带权总完工时间为目标函数的越库配送排序问题。
This paper considers the cross docking distribution scheduling problem, with the objective to minimize the total weighted completion times.
我想买激光机加工光塑料,请给我你们机器加工时的视频。
I want to get laser process plastic, and please send us the video of machining operation.
主要研究两台机器环境下的以加权完工时间和为目标函数的越库调度问题。
The paper studies the schedule problem of cross docking distribution in the situation of two machines, which objective function is the total weighted completion time.
在允许机器空闲的条件下,寻找一个工件排序,使得最大提前完工时间最小。
Under the condition of permission the idle insert, a job sequence was determined, which minimize the maximum earliness.
讨论任务的加工是不可中断,机器速度相同且机器具有不同开始加工时间的排序问题,目标函数是极小化最大完工时间。
We discuss the nonpreemptive parallel machine scheduling problem with nonsimultaneous available time, the objective function is to minimize the makespan.
由此,可以不需要熟练度而且不增加调试工时地,简单且容易地进行机床以及机器人的调试作业。
Due to this, machine tool and robot startup work can be simply and easily performed without requiring skill or increasing the startup man-hours.
我想买激光机加工光塑料,请给我你们机器加工时的视频。
I want to get laser process plastic, and please send us the vid...
我想买激光机加工光塑料,请给我你们机器加工时的视频。
I want to get laser process plastic, and please send us the vid...
应用推荐