因此在选择污水及污泥处理工艺时,应当考虑对后续工艺及最终处置的影响。
When treatment technique for sewage and sludge is selected, the factors of follow-up processing and final treatment should be considered.
现场试验表明在污泥去除最终处理前12个小时的保持时间可以产生4- 6个月的连续运行。
Field testing has show that a 12-hour wastewater retention time will yield four to six months of continuous operation before removal of sludge for ultimate disposal.
现场试验表明在污泥去除最终处理前12个小时的保持时间可以产生4- 6个月的连续运行。
Field testing has show that a 12-hour wastewater retention time will yield four to six months of continuous operation before removal of sludge for ultimate disposal.
应用推荐