利用机动法确定了老顶岩板初次来压时载荷的上限值和塑铰线的位置,得到了顶板岩体关键层的最小破断跨距。
The loci of plastic hinge line and the maximum load during first roof weighting are determined by using kinematical method, and the minimum span of roof key stratum is derived.
利用机动法确定了老顶岩板初次来压时载荷的上限值和塑铰线的位置,得到了顶板岩体关键层的最小破断跨距。
The loci of plastic hinge line and the maximum load during first roof weighting are determined by using kinematical method, and the minimum span of roof key stratum is derived.
应用推荐