景洪水电站处于三江褶皱系南部、澜沧江断裂带南段地区。
The Jinghong Hydropower Station is located in the southern of Sanjiang fold system and the south section of Lancangjiang fault.
对景洪水电站通风廊道进行了假设简化并绘制了网络节点图;
Put up hypothesis and simplification on ventilation tunnel and draw ventilation network nodes chart in Jinghong hydropower plant.
景洪水电站在工程建设过程中推行了安全文明施工设施标准化工作。
Through several-years practice, we provide new idea of safe production and management, which could be used for reference for the safe and civilized construction of hydropower stations.
由于受水位限制,景洪水电站在常年洪水时,水库必须在低水位运行。
Because of water level limitation, the Jinghong reservoir has to be operated at a low level during a perennial flood period.
介绍了景洪水电站水力式升船机塔楼模型试验的有关情况,主要从静力试验的角度进行分析研究。
The model experiment of hydraulic ship lifter tower of Jinghong Hydropower Station is described from static aspect.
景洪水电站主厂房右侧紧邻右冲沙底孔,右冲沙底孔作为二期纵向围堰的组成部分,在主厂房开挖前已经形成。
In order to ensure the excavation of sediment discharge bottom outlet at right side and foundation of the power house dam section, the blasting method was used in Jinghong power station.
介绍了昆明勘测设计研究院在景洪水电站建设中的工程地质勘察实践,总结了个人在工作过程中的一些体会和经验。
The good effectiveness of the engineering geological exploration works has been achieved with small working quantity and in a short exploratory period.
从绿化设计与施工的角度介绍了景洪水电站绿化项目的设计理念与绿化后达到的美化效果,同时对绿化养护管理提出了建议。
This paper describes the design thinking of afforestation project for Jinghong Hydropower Station and the expected effectiveness after affectation in view of.
从绿化设计与施工的角度介绍了景洪水电站绿化项目的设计理念与绿化后达到的美化效果,同时对绿化养护管理提出了建议。
This paper describes the design thinking of afforestation project for Jinghong Hydropower Station and the expected effectiveness after affectation in view of.
应用推荐