• 结果显示水量实施优化检测周期减少,漏损控制费用降低。

    The results indicated that water loss and the total cost of water leakage control decreased because of the optimal inspection interval.

    youdao

  • 结果显示水量实施优化检测周期减少,漏损控制费用降低。

    The results indicated that water loss and the total cost of water leakage control decreased because of the optimal inspection interval.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定