• 为此本文提出已建成盾构隧道基础上,结合明挖法修建地铁车站施工方案

    To this end, this thesis proposes a construction program based on the developed shield tunnel with combination of cut and cover method of construction of subway station.

    youdao

  • 修建铁路隧道主要方法矿山盾构法、沉管以及明挖法大多前面阐述

    The main methods of building railway tunnels are mining method, shield method, immersed method and cutting and covering method, most of which are expatiated in aforementioned passages.

    youdao

  • 目前国内外修建地铁车站施工方法挖法、新奥构法方法的组合变化形式。

    At present, construction methods of metro station include cut and cover, NATM, shield driven method and their combination and changing forms at home and abroad.

    youdao

  • 目前国内外修建地铁车站施工方法挖法、新奥构法方法的组合变化形式。

    At present, construction methods of metro station include cut and cover, NATM, shield driven method and their combination and changing forms at home and abroad.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定