综上所述,我们并不觉得我们时间进度计划是过分自信的,并且我们有信心在客户的成本期望之内完成任务。
Overall, we didn't feel that the schedule was too ambitious, and we were confident it would stay within the customer's cost expectations.
这并不是一个非常大的数字,其中的一些风险(比如有挑战的时间进度计划)直到项目的最后时期都会存在。
This wasn't a particularly large number, and some of them (such as the challenging schedule) would last until the final leg of the project.
当然,运行时迁移也需要仔细的计划,因此培训进度也需要进行适当的调整,以适应编制和测试有效的迁移计划所需的时间。
Of course, run time migration does require careful planning and so the training schedule should be adjusted to accommodate the time required to assemble and test an effective migration plan.
进度太快并不可取因为人们需要时间来计划养老金的支付。
Moving too quickly is undesirable because people need time to plan for the later payment of the benefit.
项目的技术、团队结构和时间计划非常有益于在不阻碍进度的情况下合并RUP 和其他工具。
The project's technologies, team structure, and schedule were very conducive to incorporating the RUP and other tools without impeding progress.
您可以调查趋势,当您学习如何将您的计划的时程规划与实际相比较时应该能够改进您的项目计划和时间进度安排。
You can examine trends, and should be able to improve your project planning and scheduling as you learn how your projected timeframes compare to actuals.
原材料、半成品的发货,由各仓库管理员根据生产计划和消耗定额,按时间进度发放,并做好标识。
The storekeepers shall release the raw materials and semi-finished products by time schedule according to the production plan and rated consumption, and make labeling properly.
我们都想重看一遍,但是计划产生得这么快,我们工作进度也很快,所以我们根本没有时间坐下来,花八个小时重看电影。
We all wanted to, but the project came up so fast and we were moving so quickly on it, we just didn't have time to sit down for eight hours to review the films.
灵活的进度安排——版本交付可能早于也可能迟于最初计划时间。
Flexible schedule - the deliverable may be required sooner or later than initially planned.
编制进度计划——分析工序顺序、工序持续时间和资源需求。
Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.
技术文件交付的时间应当符合受方工程的计划进度要求。
The time period of the handing over of technical documents shall meet the requirements of the recipient's planned schedule for the project.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
如何科学、客观地确定施工进度计划中各分部、分项工程的持续时间是施工进度计划具有合理性和可行性的保证。
In that case, ensuring the construction term of the construction schedule reasonably and impersonally would be the guarantee of the whole construction procedure.
检测时间应当列入建筑计划和施工进度表。
Sufficient time to undertake testing must be incorporated into planning and construction schedules.
首先,适当的减慢你的复习进度,这样您就可以留出更多的时间来思考你的复习计划和做一个前阶段的总结。
Firstly, slowing down the speed of review appropriately so that you can set aside more time to think about your reviewing plan and make a summary for the previous stage.
制定测试设备开发时间计划以确保测试设备的交货时间满足项目的进度。
Produceand maintain test equipment timing plans to ensure the delivery time of test equipment meet project milestone.
为了降低由进度安排不当导致项目实施失败的风险,将时间约束网络应用到项目实施进度计划研究中。
To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.
该模式的项目进度计划从系统整体出发着重强调并行项目之间的相互协调,其编制步骤可分为项目结构分解、项目活动时间估算及计划编制。
The schedule in this pattern emphasized the harmonization of parallel projects based on the whole system, and its developing steps include structure analysis, estimation of time and planning.
指出在考虑施工活动持续时间不确定的条件下,开展施工网络进度计划和优化研究,具有实际意义;
The research on risks and optimization of the construction network program is of significance when the lasting time of the construction is uncertain.
分配资源,确定每项任务所需的时间,制定项目进度计划。
A project schedule is created by assigning resources and determining the calendar time required for each task.
技术文件的交付时间应当符合受方工程计划的进度要求。
All technical documents shall be handed over in accordance with the requirements of the recipient's schedule for the project.
当招聘花费的时间比预期长时,你需要预留一些缓冲时间来调整进度或缩减项目建设计划。
You may need slightly more runway, or if a hire takes longer than expected, to readjust the schedule or shrink the build list.
讨论一些基本的项目计划要素:项目任务清单,日程计划表(进度表),沟通计划,会议时间表,项目管理等。
Discuss the base project plan elements: project Task List, schedule, Communication plan, meeting schedules, project administration, etc.
按要求提供项目实施计划书、项目任务分解表、时间进度表、预算分解表、自我监测计划;
Provide project implementation plan, project task breakdown sheet, schedule, budget breakdown table, self-monitoring plan;
按要求提供项目实施计划书、项目任务分解表、时间进度表、预算分解表、自我监测计划;
Provide project implementation plan, project task breakdown sheet, schedule, budget breakdown table, self-monitoring plan;
应用推荐