测试的创建、精炼、重放和时序安排。
由于没有使用时序安排服务的协议,该服务规范只是一个简单的接口。
This service specification is a simple interface, because there is no interesting protocol for using scheduling services.
这些任务如何活动的方法(举例来说激活命令)被称作任务的时序安排。
The way how these tasks are activated (e. g. the activation order) is called scheduling of the tasks.
生产时序安排服务提供者提供scheduling接口以决定何时何地生产这些货物。
A production scheduling service provider provides the scheduling interface to determine where goods will be produced and when.
Productions组件通过其时序安排端口提供Scheduling接口,如图10所示。
The Productions component provides the scheduling interface through its scheduling port, as shown in Figure 10.
使用BuildForge的时序安排功能,在交错间隙上运行正式的构建,从而限制拥塞等问题。
Use the scheduling capabilities of build Forge to run official builds at staggered intervals to limit the congestion problem.
提出柔性换热网络在初始设计阶段,考虑网络投入运行后,实施清洗维护时序安排的理论框架。
A theory framework is presented for flexible heat exchanger network (HEN) synthesis considering the scheduling of cleaning maintenance at initial design stage.
它包括建立流程、时序安排和卫星上行链路仪器负荷,以全自动模式管理太空船,验证地面系统和运行产品。
It included the processes of building, scheduling and up-linking instrument loads, managing the spacecraft in a fully automated mode, and verifying ground system and operational products.
很明显每个任务的时序安排对控制器的一个好的性能是至关紧要的,因此对一个摆的稳定性是有效的。
It is obvious that a correct scheduling of each task is crucial for a good performance of the controller, and hence for an effective pendulum stabilization.
频道数量上的增加将会使个性化的时序安排变得可能,通过把开始的时间错开安排,电影可以一次在多个频道上上映。
The number of channels will enable personalized scheduling, with starting times of films staggered, on several channels at once.
如此倒立摆是非常有用的在决定是否一个特殊的时序安排的选择比另一个好,在哪个情形下,在什么程度内等等。
Thus the inverted pendulum is very useful in determining whether a particular scheduling choice is better than another one, in which cases, to which extent, and so on.
的变化,反映在时序安排的40103向下计数器,必须喂以较低利率计数时钟,这并不影响产出率的PWM波的列车。
The change is reflected in the clocking arrangements of the 40103 down-counter, that must be fed with a lower rate counting clock.
对农村居民点整理潜力进行评价,明确其潜力及潜力级别,可为确定农村居民点整理重点区域、重点项目及时序安排提供依据。
The potentiality evaluation is a basic work of making sure the all-important region and projects of rural residential land consolidation.
IBMRationalPerformance Tester使您能够为运行测试脚本创建任意数量的测试项目、录制和时序安排。
IBM Rational Performance Tester enables you to create any number of test projects, recordings, and schedules for running the test scripts.
耕地开发整理潜力研究是土地开发整理规划的一项基础工作,是确定耕地开发整理时序安排的根本依据,同时也是划定耕地开发整理区的基础。
As a basis work of land development and consolidation planning, the accuracy of the research of arable land exploitation and readjustment potential bring on the scient.
本论文从时序、时频和时值三个方面剖析研究了这部小说中事件的时间安排艺术。
In this thesis, the art of temporal arrangement of events in the novel is anatomized and investigated in respect to temporal order, temporal frequency and temporal duration.
其巧设悬念、故布疑阵的故事情节安排,线索贯穿、张弛有致、时序变幻的结构设置,为提高中国儿童文学的叙事艺术水平提供了有益的借鉴与启示。
They are well-plotted, clue-unified, and variedly temporal-spatial structured. This uniqueness sends them to a great success. Their success sets a good example of the art of narration for Chinese chi…
双核DSP的引导装载程序需要适当选择启动模式,合理安排双核系统的引导时序。
It is needed analyzing boot modes of ADSP-BF561, and select a suitable mode to boot dual core in right orders.
双核DSP的引导装载程序需要适当选择启动模式,合理安排双核系统的引导时序。
It is needed analyzing boot modes of ADSP-BF561, and select a suitable mode to boot dual core in right orders.
应用推荐