依据负荷曲线的变化趋势,提出了一种能够细致考虑负荷变化率的日发电计划安排方法。
A daily generation scheduling method which can carefully consider the load variation rate is presented.
机组爬坡率(即机组的升、降负荷能力)是火电机组正常运行的一个重要参数,因此,在编制火电系统日发电计划时必须充分考虑火电机组的爬坡率约束。
Unit ramp rate is a very important parameter for unit running, so it must be seriously concerned when dis-patching unit schedule for thermal power system.
这种优化方法由相互关联的三部分组成:发电机组的年度检修计划、月和日的运行计划。
This optimization approach consists of three parts: The annual MS, the monthly and the daily operation scheduling of power systems.
这种优化方法由相互关联的三部分组成:发电机组的年度检修计划、月和日的运行计划。
This optimization approach consists of three parts: The annual MS, the monthly and the daily operation scheduling of power systems.
应用推荐