施工进度计划只是一个计划,总存在风险。
The construction schedule is only a plan, which always has risk.
施工进度计划;各项资源计划;新技术应用;
The project schedule, Each resource planning, The new technology application;
施工中的其他工作必须围绕着并适应施工进度计划的要求安排。
Other work must be centered on the construction schedule to adapt to the requirements of the arrangements.
介绍了硫磺制酸装置的组成、安装工艺及特点、施工进度计划和质量控制检查。
Composition, installation procedure and features, construction schedule and quality control and inspection of sulphur-burning sulphuric acid plants are reviewed.
根据已经确定的施工进度计划安排,拉西瓦大坝将于2008年底具备下闸蓄水条件。
The Laxiwa dam will be in a condition for reservoir impoundment at the end of the year 2008 in accordance with the fixed progress schedule.
建立每星期晚上至少2次例会制度,找出拖延施工进度计划的原因,并采取相应的有效措施。
Establish at least 2 times night meeting per week, find out reasons of delay construction process schedule, and take effective measures.
施工进度计划根据公司劳动力和资源及SECCO对施工进度要求的计划进行编制,见附录。
Construction progress schedule shall be worked out based on labor force and resources owned by company and the construction progress requirements of SECCO, see the appendix.
进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。
The project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit.
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.
介绍了P 3软件的功能和特点以及在某抽水蓄能电站工程施工进度计划编制中的应用过程及成果。
The functions and characters of the software P3 and its application to work out the construction schedule of a pumped storage power station are described.
本文运用模糊综合评判理论在施工进度计划全过程管理中,使计划在施工过程中发挥更大的经济效益。
By means of the application of the theory of fuzzy comprehensive judgement for administration of engineering progress project in construction, economic proficiency will be boosted.
在编制计划时可以很方便地调整、优化施工进度计划,在施工控制阶段,可以直接指挥生产,控制施工进度。
It may be used to adjust and optimize construction schedule planning, also manage production and control construction schedule in construction controlling stage.
在对常规施工进度计划编制方法分析的基础上,结合新工程条件的特点,就进度计划的编制技巧提出建设性探讨。
Based on the analysis for common methods of construction programme design with considering the new engineering condition, the author gives discussion on the skills of programme design.
如何科学、客观地确定施工进度计划中各分部、分项工程的持续时间是施工进度计划具有合理性和可行性的保证。
In that case, ensuring the construction term of the construction schedule reasonably and impersonally would be the guarantee of the whole construction procedure.
施工设计包括:清单工程量计算、工程量清单报价(商务标)、施工技术标、施工进度计划及施工平面图的编制。
Construction design includes: a list of projects in terms of Quantity Price (Business standard), standard construction techniques, construction schedule and construction plan preparation.
根据HNPC模型的特点,阐明了建筑施工进度计划的特征,把模糊动态规划方法引入到建筑施工进度计划调整中,并给出了具体实现方法。
According to the HNPC model, the characteristics of construction process are explained. The fuzzy dynamic programming method is introduced into the process control and the realization is presented.
居甫渡水电站大坝溢流坝段4个中墩为宽尾墩,配备4套液压滑升模板,4个宽尾墩混凝土浇筑同步施工,满足了施工进度计划和安全度汛节点工期的要求。
The concreting work of the 4 flaring piers was done simultaneously, which satisfied the requirements of both construction schedule and safely tiding over the flood period.
我们主要的计划工作项目包括费用预算和施工进度。
Our major planning items contain estimating of cost and construction schedule.
概念化和设计建筑,开发设计计划,包括设计规范,建材,成本和施工进度。
Conceptualize and design buildings and develop plans describing design specifications, building materials, costs and construction schedules.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
检测时间应当列入建筑计划和施工进度表。
Sufficient time to undertake testing must be incorporated into planning and construction schedules.
本文阐述工程项目施工进度监理工作中监理计划的制定及如何有效地利用监理计划对施工进度进行监测、调整。
This paper sets forth that how the plan of progress supervision is prepared and how it is used to supervise and update the progress in the respect of supervising the progress.
小浪底水利枢纽大坝工程施工进度进展顺利,各主要项目一直超前合同目标计划。
The Xiaolangdi water control project is constructed in smooth progress with its major items all along keeping in advance of the contractual schedule.
上述三个地区所开发项目的施工进度、销售推广计划未受此次地震影响,均按照原计划推进中。
COLI stated that the construction progress and the sales and marketing activities of all the development projects in the three regions will be progressed as planned.
而勘探资料的缺乏严重影响了整个工程的方案设计、预算计划和施工进度。
The shortage of geotechnical investigation data influences the process of the reconstruction in this area.
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;