• 实例分析表明,耦合模型施工进度管理决策较好的指导作用。

    The result of an example presents that the coupling model is useful for construction management and decision-making.

    youdao

  • 通过涟钢工程施工过程回顾总结提出了总承包项目施工进度管理有效措施

    Through review of the construction process for Liansteel project, the effective measures for construction progress management of turnkey project were summarized.

    youdao

  • 结合码头工程实践介绍工程项目施工进度质量成本以及合同管理经验。

    In combination with the wharf engineering practice, this paper introduces the construction progress, quality, costs and contract management of engineering projects.

    youdao

  • 本文运用模糊综合评判理论施工进度计划全过程管理中,使计划在施工过程中发挥大的经济效益

    By means of the application of the theory of fuzzy comprehensive judgement for administration of engineering progress project in construction, economic proficiency will be boosted.

    youdao

  • 随着基建进程加快土建工程施工进度有效地控制管理工程管理中的重要工作

    With the acceleration of infrastructure progress, effective control and management of the civil engineering construction progress is an important task in engineering management.

    youdao

  • 随着超高层建筑工程规模日益扩大结构日趋复杂导致施工进度控制管理难度加大。

    With the expansion of the scale and complex structure for projects, it is more difficult for construction scheduling control and management of super high-rise building.

    youdao

  • 施工进度问题解决方法一个汇报一次,标准格式业主和项目管理公司提出书面报告

    The progress, problem and resolution will be reported monthly to Bomag and SIP in standard written report.

    youdao

  • 同时缺少切实有效施工进度优化理论方法制约施工管理水平提高。

    At the same time, the lack of effective progress of optimization theory and methods of construction also restricts the construction management levels.

    youdao

  • 专业项目经理及经验丰富的施工队伍实行垂直管理确保施工进度与质量,工厂化的经营模式使工序形成一体免去不规范的制作损耗和工期延沓,减少现场施工制作内容,客户赢取更多有利时间价值

    Design team gains more knowledge about how customer needs can best be met, factory management mode to make each working procedure to form a whole, for customers to win more favorable time value.

    youdao

  • 提出结合柔性网络计划技术进度分析与优化方法,包括工期分析资源优化,基础上提出了基于可视化动态仿真施工进度实时管理与控制方法;

    The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;

    youdao

  • 提出结合柔性网络计划技术进度分析与优化方法,包括工期分析资源优化,基础上提出了基于可视化动态仿真施工进度实时管理与控制方法;

    The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;