实例分析表明,该耦合模型对施工进度管理和决策有较好的指导作用。
The result of an example presents that the coupling model is useful for construction management and decision-making.
通过对涟钢工程施工过程的回顾,总结提出了总承包项目施工进度管理的有效措施。
Through review of the construction process for Liansteel project, the effective measures for construction progress management of turnkey project were summarized.
结合码头工程实践,介绍工程项目的施工进度、质量、成本,以及合同管理经验。
In combination with the wharf engineering practice, this paper introduces the construction progress, quality, costs and contract management of engineering projects.
本文运用模糊综合评判理论在施工进度计划全过程管理中,使计划在施工过程中发挥更大的经济效益。
By means of the application of the theory of fuzzy comprehensive judgement for administration of engineering progress project in construction, economic proficiency will be boosted.
随着基建进程的加快,对土建工程的施工进度有效地控制与管理是工程管理中的重要工作。
With the acceleration of infrastructure progress, effective control and management of the civil engineering construction progress is an important task in engineering management.
随着超高层建筑工程规模日益扩大和结构日趋复杂,也导致施工进度控制管理难度加大。
With the expansion of the scale and complex structure for projects, it is more difficult for construction scheduling control and management of super high-rise building.
施工进度、问题和解决方法一个月汇报一次,并以标准格式向业主和项目管理公司提出书面报告。
The progress, problem and resolution will be reported monthly to Bomag and SIP in standard written report.
同时,缺少切实有效的施工进度优化理论与方法也制约着施工管理水平的提高。
At the same time, the lack of effective progress of optimization theory and methods of construction also restricts the construction management levels.
专业项目经理及经验丰富的施工队伍实行垂直管理,确保施工进度与质量,工厂化的经营模式使各道工序形成一体,免去不规范的制作损耗和工期延沓,减少现场施工制作内容,为客户赢取更多有利的时间价值。
Design team gains more knowledge about how customer needs can best be met, factory management mode to make each working procedure to form a whole, for customers to win more favorable time value.
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;