• 工程管理贯穿工程施工竣工各个阶段,工程施工全过程中,进行计划、组织、指挥协调控制

    Project management through the engineering construction to the stages of completion, in the whole process of engineering construction, planning, organizing, directing, coordination and control.

    youdao

  • 负责各类施工计划管理文件审核批准

    Being responsible for checking and approval of various operating plan and management document.

    youdao

  • 网络计划技术施工项目管理行之有效的一种管理方法,进度计划管理中得到了广泛推广应用

    Network planning technique is an effective manner in construction project management which is popularized and applied widely on progress plan and management.

    youdao

  • 如何施工管理提高网络计划技术应用水平本文讨论问题

    How to improve the applied level of network plan technology in construction management is the issue to be discussed in this article.

    youdao

  • 其中包括工程概况编制依据施工方案吊装管理安全措施计划工期应急预案

    There are project summary, compilation foundations, construction plan, hoisting management, safety measures, project time limit and emergency plan etc.

    youdao

  • 项目经理部将成立专门劳动力档案管理系统制定施工阶段劳动力需求计划

    The project management department shall establish a special labor archives management system and work out the required labor plan at different construction stages.

    youdao

  • 负责按照业主要求,进行进度计划编制分级管理并指导督办施工单位遵照执行。

    Being responsible for programming and management in grade of operating schedule as per owner's requirement, guiding and inspecting the operating unit to carry it out.

    youdao

  • 作为一种先进方法,网络计划技术施工管理结合使用,在招投标工作中更应很好地运用。

    As an advanced method, the CPM should be combined with the Gantt chart in construction management, and it can be especially well used in tendering.

    youdao

  • 管理方法研究内容,分析工程造价施工工期集成计划内涵

    The intension of integrate plan of engineering cost and construction period is analyzed based on earning value method.

    youdao

  • 本文计划组织施工监督管理方面详细阐述焦炉态维修的一种方法。

    The coke oven retrofitting under cold condition is introduced from such aspects as planning, organizing, constructing, supervising and managing in this paper.

    youdao

  • 网络计划技术方法工程施工单位进行施工组织设计管理一个有效方法

    Network planning technology is an effective method in engineering design and management for construction cnpanies.

    youdao

  • 本文运用模糊综合评判理论施工进度计划全过程管理中,使计划施工过程中发挥大的经济效益

    By means of the application of the theory of fuzzy comprehensive judgement for administration of engineering progress project in construction, economic proficiency will be boosted.

    youdao

  • 针对工程施工油料管理存在问题,介绍了油料的计划管理采购管理仓储管理方法

    In the light of the oil management in the engineering construction, this paper introduces the methods for the planning management, purchasing management and warehousing management of the oil.

    youdao

  • 项目施工期间协调先关部门所有活动对供应商施工进行计划安全质量时间管理

    Coordinate the relative department activities during the projects period and manage the contract activities for schedule, safety, quality and deadline.

    youdao

  • 建筑工程项目成本管理贯穿工程施工整个过程强化建筑施工项目成本观念,建立施工项目成本预测、成本计划、成本核算以及成本考核等手段来达到成本控制目的

    The cost management is in the whole process of construction. The purpose of the cost control can be achieved by enforcing cost ideology, planning the budget, and offering cost supervision.

    youdao

  • 施工经营管理长期计划中期计划短期计划组织要求需要协作经营。

    The management of the construction of such structures demands that long-term, medium term and short-term planning all occur in a coordinated management effort.

    youdao

  • 工程施工计划一项复杂工作,不断增长复杂因素决定了工程管理人员需要采取新的、从未被、检测过的工程施工方法。

    The paper points out the two forms of single project construction schedule and the different result in using through living examples, and analyzes the reasons.

    youdao

  • 提出结合柔性网络计划技术进度分析与优化方法,包括工期分析资源优化,基础上提出了基于可视化动态仿真施工进度实时管理与控制方法;

    The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;

    youdao

  • 提出结合柔性网络计划技术进度分析与优化方法,包括工期分析资源优化,基础上提出了基于可视化动态仿真施工进度实时管理与控制方法;

    The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;