指出在考虑施工活动持续时间不确定的条件下,开展施工网络进度计划和优化研究,具有实际意义;
The research on risks and optimization of the construction network program is of significance when the lasting time of the construction is uncertain.
网络计划技术是施工项目管理中行之有效的一种管理方法,在进度计划与管理中得到了广泛地推广与应用。
Network planning technique is an effective manner in construction project management which is popularized and applied widely on progress plan and management.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
提出了基于模糊网络进度计划的施工索赔工期分析,建立计算模型并使之程序化。
Give the analysis of construction claims construction period based on Fuzzy-network progress plan, and make it as a calculate model program.
将GERT网络技术应用于桥梁施工进度控制,通过分析矩母函数、梅森公式阐述了GERT网络的解析法,提出确定工序参数的方法。
The analytic calculation of GERT network was presented by solving moment function and Mason formula to determine the construction procedure parameters.
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.
模板工序在许多情况下是施工网络图中的关键线路,模板工艺的改进常常可以加快施工进度。
Template processes in many cases network diagram of the construction of the key lines, Process Improvement template can often speed up the construction schedule.
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;