• 2H施工难度大:水平井段长,管柱摩阻大,对施工管柱要求安全系数

    The construction of P202-2H well is hard due to long horizontal hole section and large string friction. High safety coefficient for strings in construction is required.

    youdao

  • 主要技术包括管柱工具优化设计、井口装置及地面流程设计测试方式优选、施工参数优化为核心。

    The key technologies include of optimal design on string and tools, wellhead and surface process, testing ways and construction parameters.

    youdao

  • 节点设计进行了讨论,使实际施工更具可实施性。

    The design of the steel tubular column joints is also discussed, which makes it more operable in actual construction.

    youdao

  • 介绍了现场常用管柱结构,简述工具部件作用现场施工工序

    Three type of testing pipes are introduced and function of every component and operating procedure are illustrated briefly.

    youdao

  • 实现管柱试压施工,保证施工质量

    This makes test and operation in one procedure and the operation quality is insured.

    youdao

  • 新疆四川探区深井深井压裂施工导致压裂管柱失效断裂隔器密封胶筒失效频率较高。

    In the Sichuan and Xinjiang exploration area, fracturing in the deep or ultra deep Wells frequently results in the strings' breakage and the packer seal's malfunction.

    youdao

  • 现场施工效果表明,双封单卡分段压裂管柱承压性能要求上,满足要求;

    Field application results show that the string of double-sealing and single-stick subsection fracturing can meet the demands of pressurization behavior and sand amount.

    youdao

  • 较好地解决了分层压裂技术工具技术、管柱设计技术、压裂填砂技术、施工技术等方面进行了配套

    By using dual packer technique, separate-layer fracturing has been run smoothly, with matching instrument, pipe string design, sand...

    youdao

  • 球塞气方式采用U型管柱套管尺寸限制,且施工作业较为复杂,应用受到较大限制。

    Pig lift method with U-shape double strings is easy to be limited by size of casing and very complicated in construction operation process. Thus, the large restrictions exist in the field application.

    youdao

  • 本实用新型提供制作简单施工方便明确矩形的矩形钢管柱铰接柱脚节点结构

    The articulated column node structure of a rectangular steel pipe column of the utility model has the advantages of simple production, convenient construction and unambiguous force transfer.

    youdao

  • 基于北京地铁四号线菜市口车站工程介绍了桩基施工方案论证技术措施检测试验技术。

    Based on Caishikou Station engineering of Beijing Metro Line 4, construction plan demonstration, technology measures and test technology about pile foundation of steel pipe column are introduced.

    youdao

  • 而且目前主要使用几种钢管混凝土—混凝土刚性节点钢筋贯穿,削弱承载力施工复杂

    And several type concrete-filled steel tube columns to concrete beam connections through the steel columns, which weaken capacity of the column and complex construction.

    youdao

  • 现有的压裂管柱应用于斜度深井存在明显的不足,影响了压裂施工成功率

    The pipe strings being used now for well fracture all have shortcomings in fracture operation of heavy-deviated and much deeper Wells, that decreases the success ratio of fracture operation.

    youdao

  • 现有的压裂管柱应用于斜度深井存在明显的不足,影响了压裂施工成功率

    The pipe strings being used now for well fracture all have shortcomings in fracture operation of heavy-deviated and much deeper Wells, that decreases the success ratio of fracture operation.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定