• 介绍巴东长江公路大桥北岸施工栈桥方案设计施工

    This paper describes the process of the scheme comparison and selection, design and construction of the construction trestle on the north bank side of Badong Changjiang River Highway Bridge.

    youdao

  • 介绍了水中墩基础施工施工栈桥钻孔平台方案选择施工同时介绍了钻孔围堰的施工方法

    The plan selection and construction of construction trestle bridge and bored platform were introduced, and the construction methods of borehole and cofferdam were also presented.

    youdao

  • 对新长铁路江阴铁路轮渡栈桥结构施工情况做了简要介绍

    The structure and construction technique of the Jiangyin Ferry Trestle Bridge on Xin-Chang Railway Lines were introduced.

    youdao

  • 移动式工程栈桥用于场地狭小地下结构施工

    The movable engineering trestle bridge can be used in the narrow construction site of underground structure.

    youdao

  • 介绍新长铁路长江轮渡栈桥预应力钢筋混凝土管桩施工方案选定实施

    The paper introduces the selection and execution of the construction plan of PC pipe pile and pile cap for the transfer bridge at north bank of Yangtze River on Xinyi-Changxin Railway.

    youdao

  • 温福铁路工程施工实践为例,介绍木桩栈桥技术特点基本结构施工方法

    With reference to the construction of the Wenzhou-Fuzhou Railway Project, this paper describes the technical features, basic structures and construction methods of timber pile trestles.

    youdao

  • 为此,自行设计制造成本结构简单移动快捷轻便片式仰拱栈桥隧道施工现场愈来愈普遍

    To this end, sheet-type invert trestle of low cost, simple structure, convenient mobility and light weight is becoming increasingly popular at tunnelling.

    youdao

  • 介绍原料场露天栈桥行车水泥梁进行改造更换施工及其效果

    The concrete beam modification, change and its effects for traveling crane rail in stock yard were introduced.

    youdao

  • 根据桥址特点主要技术标准要求杭州湾跨海大桥南岸栈桥进行了方案设计,主要介绍竞标钢栈桥的组成、构造和施工方法。

    According to the features of the bridge site and the technology requirements, the trestle in the south bank of Hangzhou bay bridge is designed.

    youdao

  • 设备选择应用振动沉桩计算理论,对理论进行了分析验证,成功解决了滩涂施工中钢管桩打入和拔出的技术难题,有力保证了南岸栈桥施工快速顺利进行。

    In the selection of the shaking equipment, the vibrosinking theory is applied and it is also through the analysis of this theory, the difficult technical problem of the driving and extracting pi…

    youdao

  • 设备选择应用振动沉桩计算理论,对理论进行了分析验证,成功解决了滩涂施工中钢管桩打入和拔出的技术难题,有力保证了南岸栈桥施工快速顺利进行。

    In the selection of the shaking equipment, the vibrosinking theory is applied and it is also through the analysis of this theory, the difficult technical problem of the driving and extracting pi…

    youdao