施工进度计划只是一个计划,总存在风险。
The construction schedule is only a plan, which always has risk.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
大坝混凝土施工是三峡工程能否按照总进度的要求达到计划目标的关键。
Concrete construction is the Three Gorges Dam project can progress in accordance with the requirements of the overall plan to achieve the key objectives.
大坝混凝土施工是三峡工程能否按照总进度的要求达到计划目标的关键。
Concrete construction is the Three Gorges Dam project can progress in accordance with the requirements of the overall plan to achieve the key objectives.
应用推荐