并通过施工总进度分析与优化、主要业务流程仿真运行改进,验证了该方法的可行性及实效性。
And the progress of construction through analysis and optimization, simulation run major business process improvement, test the feasibility of the method and effectiveness.
施工进度计划只是一个计划,总存在风险。
The construction schedule is only a plan, which always has risk.
施工导流是水利枢纽工程总体设计的重要组成部分,直接关系到工程总进度和工程总造价。
Construction diversion is important component of comprehensive design in water conservancy projects and has direct relationship with the whole engineering schedule and cost.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
EPC总承包项目在施工过程中存在较多的不确定因素和风险,势必影响其进度、质量、安全和成本目标的实现。
There are many uncertainties and risks in the construction process of EPC turnkey projects, which will definitely affect the progress, quality, safety and the realization of cost goals.
通过对涟钢工程施工过程的回顾,总结提出了总承包项目施工进度管理的有效措施。
Through review of the construction process for Liansteel project, the effective measures for construction progress management of turnkey project were summarized.
大坝混凝土施工是三峡工程能否按照总进度的要求达到计划目标的关键。
Concrete construction is the Three Gorges Dam project can progress in accordance with the requirements of the overall plan to achieve the key objectives.
大坝混凝土施工是三峡工程能否按照总进度的要求达到计划目标的关键。
Concrete construction is the Three Gorges Dam project can progress in accordance with the requirements of the overall plan to achieve the key objectives.
应用推荐