• 实际工程应用证明技术有效减小地下连续墙弯矩,有缩短工程施工总工期节省费用等优点。

    The practice proves that this technique can reduce the lateral shift and moment of underground diaphragm effectively and save construction time and cost.

    youdao

  • 本合同工程安装主体工期100,以施工单位实际进场日起开始计算

    Total work period of main installation of project shall be 100 days which be calculated on and from the date at which contractor access practically to project site.

    youdao

  • 通过合理优化施工方案缩短建井工期131

    Based on reasonable construction plan, shorten construction time 131 days.

    youdao

  • 大量仿真计算结果进行统计分析,可以得到工期关键路线概率分布结果,施工管理提供更多信息。

    After enough turns of simulation, the distribution of the total work period can be determined, at the same time the critical path can be found in the probability concept.

    youdao

  • 该方法通过某一施工延误发生前后网络状态差异分析,来评定延误对总工期影响

    A. m evaluates delay influence on construction time by analyzing the difference between the network before delay occurrence and the network after delay occurrence.

    youdao

  • 该方法通过某一施工延误发生前后网络状态差异分析,来评定延误对总工期影响

    A. m evaluates delay influence on construction time by analyzing the difference between the network before delay occurrence and the network after delay occurrence.

    youdao