实际工程应用证明,该技术可有效减小地下连续墙侧移和弯矩,有缩短工程施工总工期、节省费用等优点。
The practice proves that this technique can reduce the lateral shift and moment of underground diaphragm effectively and save construction time and cost.
本合同工程安装的主体总工期为100天,以施工单位实际进场之日起开始计算。
Total work period of main installation of project shall be 100 days which be calculated on and from the date at which contractor access practically to project site.
通过合理优化施工方案,缩短建井总工期131天。
Based on reasonable construction plan, shorten construction time 131 days.
对大量仿真计算结果进行统计分析,可以得到总工期及关键路线的概率分布结果,为施工管理提供更多的信息。
After enough turns of simulation, the distribution of the total work period can be determined, at the same time the critical path can be found in the probability concept.
该方法通过对某一施工延误发生前后网络状态差异的分析,来评定该延误对总工期的影响。
A. m evaluates delay influence on construction time by analyzing the difference between the network before delay occurrence and the network after delay occurrence.
该方法通过对某一施工延误发生前后网络状态差异的分析,来评定该延误对总工期的影响。
A. m evaluates delay influence on construction time by analyzing the difference between the network before delay occurrence and the network after delay occurrence.