通过工程实践总结,对施工后浇带应用方面的一些问题进行了分析,并提出了改进意见。
Through engineering practice and summary, some problems in terms of application of post cast zone for construction were analyzed, and improvement Suggestions were put forward.
在现代建筑施工中,为了解决混凝土收缩、不均匀沉降等问题往往设置了后浇带。
The latter cast belt is usually set up in order to resist the contraction and uneven settlement of concrete in modern construction.
通过作者多年在水池设计中所遇到一些常见问题,从结构专业的角度出发,分析探讨了地下水位的确定、伸缩缝的设置、后浇带的做法及设计与施工配合等问题。
The author analyses some problems in pool design, such as the determine of groundwater level, the setting of shrinkage joint, practice of later casting zone and the fitting of design and construction.
本文中较为详细地介绍了高层建筑后浇带的设计与施工,分析了其中存在的问题,提出了具体方法和措施。
Design and construction of high-rising building's post-casting zones is introduced in detail, some existed problems are analyzed and some relative measures are put forward.
根据工程施工实践,总结在超长混凝土结构中采用加强带代替后浇带的原理和施工工艺措施。
According to the construction practice, it summarized the principle of reinforcing band of the super-long concrete structure and the construction process.
根据实践,介绍了后浇带的留设位置、设计形式和施工方法。
According to author's experience, design position, design form and construction approach of the late poured band are in detail introduced in this paper.
本文从设计及施工方面分析了后浇带的使用。
This text is from the design and construction aspect analysis empress sprinkle to take of application.
为便于作业及防止产生收缩裂缝,选用不设后浇带一次性浇筑施工技术。
In order to work and prevent from producing contraction cracks, constructional technique of disposable placing of not installing back pouring area is selected.
超长混凝土结构的设计和施工中可以采取设置后浇带、采用微膨胀——补偿收缩混凝土或设计无粘结预应力混凝士结构来防止温度收缩裂缝的产生。
The designer can set post-pouring belt, using UEA con- crete and designing pre-stressing concrete structure to avoid the crack caused by temperature and shrinkage.
混凝土施工的好坏直接影响到建筑工程的质量,后浇带的施工也直接影响整个建筑的应用安全。
Concrete construction will have a direct impact on the quality of construction and after pouring construction also directly affects the building safe.
实际施工中,后浇带回填质量很难保证,因此,尽量减少后浇带的留置对结构是有利的。
Nevertheless, it is very hard to ensure backfilling quality in after pouring zone during the period of construction.
笔者就从钢混结构的混凝土施工和后浇带施工等方面进行简述。
This paper describes from the reinforced concrete structure poured concrete construction and construction after pouring and other aspects briefly.
笔者就从钢混结构的混凝土施工和后浇带施工等方面进行简述。
This paper describes from the reinforced concrete structure poured concrete construction and construction after pouring and other aspects briefly.