• 合同控制性关键工程预应力连续组合箱梁施工

    The controlled crucial works for this contract section is the construction for the prestressed concrete continuous combined box beam.

    youdao

  • 本文就襄高速公路第12合同施工实践谈几点体会。

    This paper introduces the construction practice of the high piers and columns of No. 12 Contract Section of Xiangyang-Shiyan Expressway.

    youdao

  • 介绍西江下游航道整治C1合同蟠龙工程施工方法类似工程提供借鉴

    This paper presents the construction method of reef blasting of Contract Section C1 in Downstream Regulation Engineering of Xijiang River, which may serve as a reference for similar projects.

    youdao

  • 合同石方爆破采用控制爆破光面爆破结合的施工方案

    The stonework blasting of this contract USES construction program that combine blasting deep hole and smooth blasting.

    youdao

  • 针对某合同段取土场地面存在限粘土NCS固化剂进行处理施工技术

    There is high water-level clay layer in BEIJING- SHANGHAI EXPEDSSWAY, the paper introduces construction technology of treating it with NCS curing agent.

    youdao

  • 结合铁路第十八合同施工实际,对新建铁路建设项目施工技术资料收集整理竣工资料的编制工作进行探讨。

    Linking with the construction of the 18th section of Ganlong railway, the collection and sorting out of technology data and drawing up of accomplished data are discussed.

    youdao

  • 结合铁路第十八合同施工实际,对新建铁路建设项目施工技术资料收集整理竣工资料的编制工作进行探讨。

    Linking with the construction of the 18th section of Ganlong railway, the collection and sorting out of technology data and drawing up of accomplished data are discussed.

    youdao