制定与工程量清单计价体系相适应的建设工程施工合同条件。
Enacting the construction contract condition of the construction engineering, which is suitable for the valuation system of the list of engineering amount.
本文对如何应用FIDIC施工合同条件的条款处理工程变更进行了简要介绍。
The construction contract FIDIC conditions of the application of the provisions dealing with changes in the project briefing.
EPC合同模式与传统的施工合同条件模式相比,风险分配原则有很大的不同。
Compared with the conditions of construction contract of EPC mode and the traditional mode, risk allocation principles are very different.
建设工程施工合同法定解除权的行使,不仅需要满足法律上严格的限定条件,也要遵循相应的法定程序与方法。
The enforcement of the legal relief right of construction contract, not only need to meet the strict limited condition in law, but also need to follow corresponding due course and method of law.
传统挣值法主要适用于工程量清单合同条件下施工单位项目管理活动。
Abstract: The traditional Earned Value Method(EVM) is mostly used at the condition of BOQ.
传统挣值法主要适用于工程量清单合同条件下施工单位项目管理活动。
Abstract: The traditional Earned Value Method(EVM) is mostly used at the condition of BOQ.
应用推荐