主塔墩基础采用钻孔灌注桩群桩基础,采用钻孔平台作为桩基施工临时设施。
The bored pile-group is used for the foundation of the main pylon piers and a drilling platform will be used as temporary facilities for construction of the pile foundation.
施工现场的道路、机具、材料、临时设施、供电线路、给排水管道等的布置和管理按承包商的规定进行。
All on-site roads, machines, materials, temporary facilities, power lines, water pipelines shall be laid out and managed according to CONTRACTOR requirements.
“临时工程”指在工程实施、完成及修补其任何缺陷(时)的过程中,需要(或有关)在施工区内部或周围搭建的所有(各种)种类的临时性工程设施(承包人的设备除外)。
"Temporary works" means all temporary works of every kind (other than Contractor 'Equipment) required in or about the execution and completion of the works and the remedying of any defects therein.
在施工系统中,重大临时设施厂址选择常常涉及到大量的不确定性因素。
There are a lot of uncertainty factors which affect the location choice of the important temporary facilities in construction system.
在施工系统中,重大临时设施厂址选择常常涉及到大量的不确定性因素。
There are a lot of uncertainty factors which affect the location choice of the important temporary facilities in construction system.
应用推荐