建立其数学模型,并进行计算机仿真验证,其结果显示出该方法可以有效地提高目标的位置精度与可靠性。
Mathematics model is established, and verified by the imitation of computer. The results show that the method can effectively improve the accuracy and reliability of the position.
建立其数学模型,并进行计算机仿真验证,其结果显示出该方法可以有效地提高目标的位置精度与可靠性。
A mathematical model is established and validated with computer imitation. The results show that the method can effectively improve accuracy of object position and reliability.
通过与实际交通事故的比较、分析、修正和验证,建立了基于驾驶模拟器系统评价道路安全性的主观评价方法。
Through the comparison, analysis, revising and proving with the real traffic accident, the security subjective appraisal method based on the Road Traffic Driving Simulator had been set up .
首次建立了测量精度与仪器精度、建模方法之间的传递函数,并进行了实验验证。
The propagation function between the prediction accuracy, instrumental precision, and regression method is established, which has been verified experimentally.
尝试用有限元分析的方法模拟TLD中流体与结构的耦合作用,并验证了由此方法建立起来的流固耦合模型的可靠性;
Finite element method is used to carry on numerical simulation of fluid-structure interaction for the system of TLD, and a verification of the reliability of fluid-structure coupled mode is made.
最后结合实例详细论述了一个软件可靠性模型的建立与验证过程并介绍了一种软件可靠性模糊综合评估方法。
Finally, according to the 12366 Call Cernter, I establish a software reliability model and introduce a fuzzy comprehensive evaluation method for software reliability.
该方法主要包括验证模型的建立与验证平台的搭建两部分内容。
The new method can be divided into two parts: the construction of verification model and the construction of verification platform.
建立了多传感器信息融合系统中的可变模糊识别模型,把可变模糊方法应用到多传感器信息融合工件识别中,并用一个具体的实例验证了该方法的合理性与可行性。
The fuzzy variable recognition model of multi-sensor data fusion system is established, and then the model is applied to multi-sensor data fusion system for parts recognition.
通过与标记部分正例样本的PU学习算法对比,实验证明该方法能够建立性能较好的分类器。
The experiment results show that the proposed approach performs very better than the PU learner based on labeled partially positive documents.
然后,以工期最小为目标与工期-成本权衡目标建立关键链识别方法模型,并通过算例验证了该方法的有效性。
The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.
应用线性规划中有配套约束的资源分配理论建立数学模型并给出求解格式,通过实际工程算例验证该方法的正确性与有效性。
This article will build and resolve mathematic model of it through theory of linear programming in a series of restriction of resources. In fact, this theory was applied in construction.
通过与模型振动台试验的实测值进行了对比分析,验证了建立的计算模型及动力分析方法的正确性。
With the comparison of FEA data and actually measured data of the seismic desk simulation experiment, the validity of calculation model of this bridge and dynamic analysis has been validated.
经实验验证,该方法提高用户模型的适应性与准确性,降低建立模型时对用户信息的要求。
Experiment proves that the user model proposed in this paper improves the adaptability and accuracy, and reduces the requirements of the users when constructing it.
经实验验证,该方法提高用户模型的适应性与准确性,降低建立模型时对用户信息的要求。
Experiment proves that the user model proposed in this paper improves the adaptability and accuracy, and reduces the requirements of the users when constructing it.
应用推荐