• 项目规划不特定于某个并发clearquest方案设计最佳操作方式。

    Project planning is a best practice that is not specific to parallel ClearQuest schema design.

    youdao

  • 相应参赛单位授予本方案设计咨询合同

    The corresponding contestant will be awarded the proposal design consultation contract for this project.

    youdao

  • 所有建设项目选址定点、方案设计各个阶段包含交通影响分析方面内容。

    All construction projects in the site location, programme design should include all stages of the traffic impact analysis.

    youdao

  • 工作作为一个完整位置检测系统重要组成部分涵盖了方案设计硬件研制、系统联调工程项目研制的全过程。

    As the important part of the position detecting system, the work of the dissertation covers scheme design, the hardware development, software realization, the system unit debug, etc.

    youdao

  • 聂亮硕士,A BB机器人焊接应用中心关键客户主管从事机器人焊接方向关键客户方案设计项目管理等工作

    Nie Liang, master degree, key client executive of welding application centre of ABB robotics division. He engages in program design and project management of robot welding for key clients.

    youdao

  • 第四部分阐述项目管理信息系统方案设计

    The fourth part of this paper describes of the design scheme of the project management system.

    youdao

  • 所以我们了解用户需求当成重要技术工作来研究,以此作为集成项目方案设计依据

    Therefore, we treat understanding the users' needs as the most important technology work and make it as the evidence of scheme designs of integration projects.

    youdao

  • 培训项目实施方案设计学习活动设计作为研究的主要内容

    How to design the project for implementation and how to design the learning activity were the main content.

    youdao

  • 项目作出决策控制工程造价关键就在于设计阶段设计阶段中的方案设计阶段又尤为重要。

    After the planning, the key point of cost control is in the design stage, and in which the schematic design is the most important.

    youdao

  • 负责设备设计支持气化项目设备专业方案设计,100%按时完成

    Take responsibility of equipment design, support projects Gasification island instrument mechanical design work, achieve 100% on schedule deliverable work.

    youdao

  • 设计阶段涵盖了概念设计方案设计初步设计对于特殊项目还包括现场技术配合等全面专业服务

    Design covers conceptual design, design, preliminary design, for special projects include on-site technology with comprehensive professional services and other.

    youdao

  • 参与产品项目立项可行性调研,参与系统方案设计

    Participate in product project feasibility research, participate in the design of system solutions;

    youdao

  • 调查技术方案设计分析交通系统运行入手,首先进行成果设计基础上调查项目、内容及其相互联系进行了设计

    The survey was designed firstly on the basis of the analysis on operation of transportation sys - tem and was results oriented designed.

    youdao

  • 我们寻求经验丰富、有上进心,且国内项目建筑方案设计初步设计方面具有团队领导能力项目建筑师。

    We are looking for experienced, self-motivated individuals capable of leading a project team in the production of architectural schematic design and design development documents for projects in China.

    youdao

  • 涉足万维网高速缓存领域多年掌握了万维网高速缓存技术的方案设计项目实施系统配置维护第一手经验

    I have been involved in the Web caching area for quite a few years and learned first hand experience in Web cache solution design, implementation, configuration and maintenance.

    youdao

  • 基础地理信息中心充分调研基础组织精兵强将,调集资料加班加点顺利完成项目方案设计工作

    Provincial Geomatics Center of China in the full study, based on the crack organize, mobilize information, overtime, the successful completion of the project proposal design.

    youdao

  • 根据项目特点依照国际化设计理念流程进行照明方案设计

    Designing features of the program according to international designing concept and procedure.

    youdao

  • 项目范围主要涵盖城市规划、城市设计含景观规划)、大型公共建筑概念设计方案设计特殊建设项目研究设计等。

    The projects of Creative Center cover urban planning, urban design, landscape design, conceptual design and scheme for large-scale public buildings, and research of special projects.

    youdao

  • 项目方案设计研制调试周期通常3个月左右

    From project designing to developing and debugging, the cycle is only 1 to 3 months in general.

    youdao

  • 我们产品技术服务项目涵盖项目规划方案设计设备设计制造自动化集成以及售后服务等各个环节。

    Our products and service include project planning, solution designing, equipment designing and producing, robotizing integration and after service.

    youdao

  • 引水灌溉工程开发建设项目,在施工中产生水土流失,具有一定特殊性;其水土保持方案设计也有一定的规律可循。

    Soil erosion caused by exploitation and construction during diversion and irrigation work had certain particularity, and the soil and water conservation of which had special rules too.

    youdao

  • 引水灌溉工程开发建设项目,在施工中产生水土流失,具有一定特殊性;其水土保持方案设计也有一定的规律可循。

    Soil erosion caused by exploitation and construction during diversion and irrigation work had certain particularity, and the soil and water conservation of which had special rules too.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定