1959年,新安江水电站建成蓄水。
新安江水电站开工那年,他只有11岁,对一个少年来说,这是不能承受的沉重记忆。
Xin 'an river hydropower station, he only started to 11 years old, a young, it is unable to bear the burden of memory.
新安江水电站溢流面采用环氧砂浆进行裂缝修补已40年,是我国较早采用环氧砂浆进行修补的工程。
The crack repairing by epoxy mortar facing on the spillway of the Xin′anjiang Power Plant was made 40 years ago.
新安江水电站溢流面采用环氧砂浆进行裂缝修补已40年,是我国较早采用环氧砂浆进行修补的工程。
The crack repairing by epoxy mortar facing on the spillway of the Xin′anjiang Power Plant was made 40 years ago.
应用推荐