• 原理进行设计结构采用等截面复合式衬砌,施工采用侧壁台阶组合暗挖施工,工程设计难度大、施工风险高。

    It is a super-shallow-berried single-span tunnel project. The New Austrian Tunneling Method is used in design of station, constant-section composite lining is employed for the station structure;

    youdao

  • 原理进行设计结构采用等截面复合式衬砌,施工采用侧壁台阶组合暗挖施工,工程设计难度大、施工风险高。

    It is a super-shallow-berried single-span tunnel project. The New Austrian Tunneling Method is used in design of station, constant-section composite lining is employed for the station structure;