在许多情况下,更新用例和相关的文档要比修改代码本身花费更多的时间。
In many cases, updating the use cases and related documentation took longer than the code fix itself.
显然,这个操作花费的时间比只更新单一文档长。
Obviously, this can take longer than updating just a single document.
如果更新任务花费大约30分钟完成,我们可以查看同一MiscellaneousEvents文档中的日志文件以了解花费这么长时间的原因。
If the update task is taking approximately 30 minutes to complete, we can look in the log file at the same Miscellaneous Events document to get a picture of why it? S taking so long.
候选标准也是一个“工作进程”,其同样不能作为参考资料。该文档可以在任何时间内更新、替代、呈递、废除。
Candidate recommendation is also a "work in progress" and should not be used as reference material. The document may be updated, obsolete, and replaced at any time.
提出一种基于SAX模型的XML文档更新算法,利用SAX模型占用时间和空间少的优点进行文档的更新。
This paper proposes an XML update algorithm based on SAX model, which can decrease memory and time take for updating XML document.
提出一种基于SAX模型的XML文档更新算法,利用SAX模型占用时间和空间少的优点进行文档的更新。
This paper proposes an XML update algorithm based on SAX model, which can decrease memory and time take for updating XML document.
应用推荐