上层建筑整体吊装是船舶建造中一项新工艺。
Superstructure assembly of prefabrication is new technique of ship building.
介绍同时使用8台卷扬机整体吊装钢网架及其吊挂观光平台的施工技术。
This paper introduces the installation technology for integral lifting of the steel rack and sightseeing platform with 8 hoisters at the same time.
针对该网架的工程特点及现场的具体情况,决定采用绞磨拔杆整体吊装方法。
According to engineering characters and concrete situation the winching and rocker integral hoisting method is adopted.
结合九畹溪大桥施工实例,详细介绍采用缆索吊分段双肋整体吊装钢管拱施工技术。
Based on the construction of Jiuwanxi Bridge, the paper describes the integral lift and assembly technology of steel tube arch in segment of double rib with cable crane.
吊装式导管架和整体吊装甲板显著地简化了平台的海上安装并且大量地减轻了结构质量。
The lifting type jacket and integrated deck structure have significantly simplified offshore installation of the platform and greatly reduced the weight of the structure.
简要介绍灯泡贯流机组在安装过程中,导水机构整体吊装方法、受力校核及吊装翻身过程。
It briefly introduces the integral hoisting method of gate mechanism, stressing check and hoisting turnover process during the erection of bulb tubular turbines.
绍兴世贸中心22 ~24层之间连廊为钢结构桁架体系,安装时采用整体吊装提升技术。
Steel truss gallery of Shaoxing World Trade Center 22 ~ 24 floors is lifted by integral hoisting technology.
整体吊装盾构机主体是一种快速简便的盾构机转场通过地铁车站的方法,节约了地铁车站建设成本。
Integral lifting main body of a shield machine is a quick and simple shield machine transit method through subway stations, and can save subway station construction costs.
在轻型钢屋架整体吊装的施工过程中,经多次实践,总结出圆形轻型钢屋架的整体吊装的施工工艺。
In the construction course of the light steel overall hoisting of roof truss, this paper now summarizes the construction technology of the hoisting of light steel roof truss by many practice.
第29届奥运会青岛国际帆船中心陆域媒体中心钢结构观光塔厅,总重大,造型独特,整体吊装难度大。
The tour tower hall in the 29th Olympic Qingdao international Marina land-based area media center with a heavy specific shape is hard to integral hoisted.
为了保证钢结构安装精度,在吊装过程中,对桁架的整体变形进行了计算和监测。
In order to ensure the installation precision of steel structure, the overall transformation of the truss is calculated and monitored during the hoisting.
为了保证钢结构安装精度,在吊装过程中,对桁架的整体变形进行了计算和监测。
In order to ensure accuracy, and Assembly of steel structure in the installation process, the overall on the truss computed deformation and surveillance.
为了保证钢结构安装精度,在吊装过程中,对桁架的整体变形进行了计算和监测。
In order to ensure the accuracy of steel installed in the lifting process, the overall deformation of the truss is calculated and monitored.
为了保证钢结构安装精度,在吊装过程中,对桁架的整体变形进行了计算和监测。
To ensure the accuracy of steel installed in the lifting process, the overall deformation of the truss is calculated and monitored.
干燥机整体出厂,整体运输,只需吊装就位,安装定位非常容易。
Dryer factory as a whole, the overall transport, simply lifting in place, positioning is very easy to install.
采用整体竖转的施工方法进行斜拉索桥倾斜索塔的吊装,可降低索塔结构的高空拼装工作难度。
In construction of cable tower of cable-stayed bridge, whole vertical-rotation lifting method can reduce difficulty in assembly of cable tower structure at high altitude.
在模具内浇注预养好的坯体,由翻转吊装机构将模具整体经空中翻转90度后放置于切割小车上进行脱模。
Mould the base body in the mould, and lay on the cutting trolley for demoulding after turning the cast mould over 90 degree by the upset hoist.
文章较详细地介绍了该大型钢吊箱分节整体水上吊装的施工方法。
The paper introduces the construction method of the large steel hanging box in detail.
海上墩柱整体预制吊装在我国第一座外海桥梁东海大桥非通航段施工中得以研究和全面应用。
The technique of pier integral precasting at the sea was researched and applied in the innavigable section construction of Donghai Bridge(the first bridge at the sea in China).
海上墩柱整体预制吊装在我国第一座外海桥梁东海大桥非通航段施工中得以研究和全面应用。
The technique of pier integral precasting at the sea was researched and applied in the innavigable section construction of Donghai Bridge(the first bridge at the sea in China).
应用推荐