• 衡量阵列性能影响使用900gb数据库执行oltp(联机事务处理)工作负荷

    To measure the performance impact of arrays, a 900gb database was used and an OLTP (Online Transactional Processing) workload was exercised.

    youdao

  • 这个代理向服务器转移处理负荷一个例子——不必运行代理Notes工作连接关系数据库

    This agent is an example of off-loading processing to the server-you don't have to connect to the relational database from the Notes workstation where you run the agent.

    youdao

  • 例如管理员可以决定数据库连接最大数量以及处理实际工作负荷应该所用预备状态缓存空间最优数量。

    For example, an administrator can figure out what is the maximum number of database connections or optimum number for prepared statement cache size that should be used to handle a real world load.

    youdao

  • 例如管理员可以决定数据库连接最大数量以及处理实际工作负荷应该所用预备状态缓存空间最优数量。

    For example, an administrator can figure out what is the maximum number of database connections or optimum number for prepared statement cache size that should be used to handle a real world load.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定