• 开挖适用于地基土质好、开挖深度不深,以及施工现场有足够放坡场所工程

    Step-slope excavation is suitable for the project of which the foundation has better soil properties, lower excavation depth or enough site space for step-slope.

    youdao

  • 深圳地铁工程少年宫开挖基坑围护结构采用1∶0.3结合预应力锚索联合支护体系。

    Open-cut slopes of 1:0.3 gradient reinforced by soil nails and pre-stressed anchoring cables are adopted for the foundation pit of Shaoniangong station of phase 1 of Shenzhen Metro.

    youdao

  • 深圳地铁工程少年宫开挖基坑围护结构采用1∶0.3结合预应力锚索联合支护体系。

    Open-cut slopes of 1:0.3 gradient reinforced by soil nails and pre-stressed anchoring cables are adopted for the foundation pit of Shaoniangong station of phase 1 of Shenzhen Metro.

    youdao