• “跃龙”品牌系列电缆桥架最大载荷支撑间距应小于允许载荷支撑荷和支撑跨距

    The calculation of ledger maximum bending moment and deformation the even load of scaffold board and live loads above the ledger.

    youdao

  • 举例对大支撑跨距离心压缩机转子进行稳定性分析,提出转子轴系进行优化设计方案

    Furthermore, the stability of rotor shaft system in centrifugal compressor with largely supported span is analyzed in example and the optimized design scheme for rotor shaft system is pointed out.

    youdao

  • 摘要介绍了我国大支撑跨距离心压缩机现实工作中的应用支撑跨距离心压缩机的设计技术难点进行分析。

    Abstract: This paper has analyzed the design and technical difficulties of centrifugal compressor with largely supported span and its application in realistic job.

    youdao

  • 较近支撑不可行时,则只能最大跨距间隔进行支撑

    Supports shall be spaced at the maximum spans only when closer support is not possible.

    youdao

  • 所有管件处以及第12.2规定一般跨距间隔托架、管转角系统提供支撑

    Supports for tray, channel, and Angle systems shall be provided at all fittings and at the normal span intervals specified in paragraph 12.2.

    youdao

  • 所有管件处以及第12.2规定一般跨距间隔托架、管转角系统提供支撑

    Supports for tray, channel, and Angle systems shall be provided at all fittings and at the normal span intervals specified in paragraph 12.2.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定