• 文章通过计算分析,发现可以支座负弯矩调幅小梁间距办法满足侧向稳定要求

    This paper can satisfy the requirement with steady lateral buckling with the method that scales down the bending moment and abate the space between beams.

    youdao

  • 不同连续混凝土浇筑后连续预应力张拉顺序会导致永久支座弯矩区的应力储备不同。

    The cast of concrete at different end and the post-tensioning of continuous prestress make the negative bending moment section of the permanent support have different compressive stress reservation.

    youdao

  • 连续组合梁在内支座负弯矩区段会出现混凝土拉、钢梁受压不利局面

    Adverse condition of concrete in tension and steel joist in compression occurs at inner support regions of continuous composite steel concrete beams.

    youdao

  • 钢-混凝土组合连续梁桥中间支座附近弯矩区,导致桥面混凝土开裂缩短使用寿命

    Negative bending moment nearby the middle supports of composite steel-concrete continuous beam bridge, will cause floor deck concrete to crack and shorten its life.

    youdao

  • 钢-混凝土组合连续梁桥中间支座附近弯矩区,导致桥面混凝土开裂缩短使用寿命

    Negative bending moment nearby the middle supports of composite steel-concrete continuous beam bridge, will cause floor deck concrete to crack and shorten its life.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定