水头、轴头、采用生铁套,耐磨耐用,提升装置分电动和手动两种。
Head, shaft head, using cast iron sleeve, wear durability, lifting equipment sub-two kinds of electric and manual.
电动双轴间隙调节装置,气动上盖提升装。
Electric double-shaft clearance adjustment device, pneumatic upper cover lifting device.
提升机闸瓦间隙大小受到轴窜、偏摆等的影响,所以其值是一个动态变化的量。
Because the brake clearance is influenced by axis moving, the swing of disk brake, its result is a variable quantity.
这些轴中都安装了钢丝绳(无电缆),帮助提升重型设备,比如电力工具,环形电缆和其他的荷载。
These are reels equipped with wire rope (non-electrical cables) to provide spring assistance to the lifting of heavy items such as power tools, looped cables, and other loads.
轴上的风扇叶片(9)产生的风力通过吹风口(11)进入拾膜桶(5)内,将残膜吹进提升膜箱(16)里。
Wind power generated by fan blades (9) on the shaft enters a film picking barrel (5) through a wind blowing port (11) and blows the remnant films into a lifting film box (16).
HC系列,液力偶合器齿轮数控分度表(第4轴,非提升式),标准模型,每1和5度索引(72d和360d)。
HC Series, CNC Hydraulic Coupling gear indexing Tables (4th axis, non-lifting type), the standard model are every 1 and 5 degrees indexing (72d and 360d).
螺旋轴的入水头、轴头、采用生铁套,耐磨耐用,提升装置分电动和手动两种。
The head and spindle nose of the screw shaft use the pig iron which is durable and wear-resisting. The lifting equipment can be divided into motor operation and hand operation.
螺旋轴的入水头、轴头、采用生铁套,耐磨耐用,提升装置分电动和手动两种。
The water inlet of spiral axle and axle head adopt pig iron cover for wear proofing and long life operation. The lifting equipment has two types, manual control and electric control.
摇臂通过转轴、凸轮、滑轮、钢丝绳、提升杆与配重块相连,初始位置可由挡轴选定;
The rocker arm is connected with the balance weight block through a rotary shaft, a cam, a pulley, a steel cable and a lifting rod, and an initial position can be selected through a barrier shaft.
2005年又规划对市场按“两轴”、“七区”进行综合环境整合,实施升级改造,整个市场品质明显提升。
In 2005, a comprehensive plan for the market's upgrade and rectification was carried out, turning the market into a high-quality establishment with a brand new layout of "two axes and seven blocks".
2005年又规划对市场按“两轴”、“七区”进行综合环境整合,实施升级改造,整个市场品质明显提升。
In 2005, a comprehensive plan for the market's upgrade and rectification was carried out, turning the market into a high-quality establishment with a brand new layout of "two axes and seven blocks".
应用推荐