• 拒绝要求重新设计。如果客户提出的替代方案可以接受需要经认可设计资料进行修订与该供应商联系,要求其接受附带成本费用。

    Reject subject to redesign. When a deviation may be accepted but would require revision to approved design data, the vendor will be contacted requesting that associated costs are accepted.

    youdao

  • 分析比较几种检测标准取值依据提出检测结果取值的方案国家测试标准GB/T 15789-1995《土工布透水性测定方法》的修订提供依据。

    The scheme of drawing figures from test results was pointed out by analyzing on basis of drawing figures, for providing the basis on revising for national test standard GB/T 15789-1995 .

    youdao

  • 分析比较几种检测标准取值依据提出检测结果取值的方案国家测试标准GB/T 15789-1995《土工布透水性测定方法》的修订提供依据。

    The scheme of drawing figures from test results was pointed out by analyzing on basis of drawing figures, for providing the basis on revising for national test standard GB/T 15789-1995 .

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定