设计是控制工程造价的关键。
技术与经济相结合是控制工程造价的最有效手段。
Technology and economic integration of project cost control is the most effective means.
通过实施全过程控制来保证对建设单位有效控制工程造价。
Thus, the efficient control of project cost for construction units can be guaranteed through implementing whole course control.
技术与经济相结合是合理确定和有效控制工程造价的最有效途径。
The combination of technology with economy is most effective way to reasonably determine and well control the engineering cost.
施工合同管理是工程项目管理的核心,是控制工程造价的重要手段。
Construction contract management is a central part of project management and also an important tool to control project cost.
加强工程竣工结算审核,是合理确定和有效控制工程造价的重要措施。
It is important measure rationally determining and effectively controlling the project costs to enhance the settlement examination and verification of completed projects.
阐述了在初步设计和施工图设计阶段控制工程造价应遵循的原则与方法。
The text expatiate the tenet and method that should be follow to control project cost during pre design and detailed design for construction section.
对于控制工程造价来讲,建设项招投标及签订合同阶段是非常重要的一个阶段。
As for the control engineering construction cost, the bidding and contract of construction project is a very important stage.
为完整而有效地控制工程造价,应对影响工程造价的三个阶段实施全过程控制。
For whole and effective controlling engineering cost it is needful to implement all process control to three sections of influence engineering cost.
工程造价控制是个动态过程,勘察设计阶段是控制工程造价重要而有效的环节。
The control of engineering cost is a dynamic process. The exploration and design stages are an important and efficient link to control engineering cost.
分析目前在设计阶段确定和控制工程造价存在的主要问题,提出解决问题的思考。
Analyze the major question on Ascertain and Controlling Project 'Cost in Design Period, and give some suggestion to solve the problem.
阐述了如何有效地控制工程造价,降低资金成本,提高资金效益的几点意见和措施。
During the project construction being implemented It expounds several Suggestions and measures while are how to control the cost, reduce found cost, raise the found result.
针对工程造价超概算问题,本人认为设计是关键,通过限额设计可以控制工程造价。
In view of over estimate budget in engineering cost, the author thinks that design is the key, and quota design is the best way of control engineering cost.
工程建设过程中,合理的控制工程造价和节约建设资金越来越为投资者所重视和关注。
The rational controlling of engineering cost and saving construction capital are more and more paid attention by investors in engineering construction process.
控制工程造价,充分发挥钢结构建筑技术经济上的综合优势,工程设计阶段是关键阶段。
The control engineering construction cost, develops in the steel structure building technology economy the comprehensive superiority, the engineering design stage is the critical phase fully.
分析了工程建设前期造价控制的必要性,提出了在建设前期控制工程造价的有效途径和措施。
The necessities of controlling construction cost in the early stage of a construction project are analyzed.
摘要:文章针对现行招投标体制下如何有效控制工程造价进行分析,并且提出了一些具体措施。
Abstract: this paper discusses the current bidding system, how to effectively control engineering cost analysis, and puts forward some concrete measures.
控制工程造价,是企业管理的重要组成部分,造价管理水平的高低决定了企业经济效益的好坏。
The control of construction cost is a key composite in administration of an enterprise, deciding the economic benefit of an enterprise.
优选最合理和经济的设计方案,是保证和确定合理造价的前提,也是有效控制工程造价的关键。
Optimizing the most reasonable and economic design program, is the guarantee and determine the premise of the reasonable cost, is the key to effective control of the project cost.
剖析了目前工程建设中普遍存在缺乏系统控制工程造价的观念、设计阶段管理制度不完善等问题。
Analyses some problems existed in project construction, such as, lack idea of control engineering cost, deficient management system in design stage, many visas made in the field, etc.
结合工程建设和管理实践,总结了有效控制工程造价,合理降低建设成本的具体管理对策及方法。
Summarizes, in combination with project construction and management practice, concrete management measures and ways to reasonably reduce construction cost.
阐述了如何优化设计以降低或控制工程造价,提出了农村公路建设中设计阶段控制造价的几点措施。
How to optimize the design in order to reduce or control the project cost was described, several measures to control costs in the design phase of rural highway construction were proposed.
在项目作出决策后,控制工程造价的关键就在于设计阶段,而设计阶段中的方案设计阶段又尤为重要。
After the planning, the key point of cost control is in the design stage, and in which the schematic design is the most important.
文章从工程造价的合理确定与有效控制工程造价两个方面阐述了工程造价管理在项目施工中的重要作用。
From two aspects of the rational determination and effective control of the construction cost, this paper expounds the important functions of the management of the construction c...
通过对地杰国际城及星河世纪城项目结构设计的回顾与体会,对如何在设计中合理控制工程造价进行了探讨。
The article discusses how to control the overall engineering cost in design when reviewing Dijie International City and Xinghe Century City projects.
本文通过分析市政工程在设计阶段造价控制存在的问题,提出了市政工程设计阶段控制工程造价的一些初步思路。
This article analyzes the existing problems in cost control of municipal works in design stage, and puts forward ideas to control the cost of municipal works in design stage.
本文对工程造价管理角度进行了论述,从不同的角度分析了控制工程造价的方法,阐明如何科学地控制工程造价。
This paper discusses the management of engineering cost, analyzes the method to control engineering cost from different aspect, and states how to control engineering cost in reason.
[摘要]招标阶段作为基建工程一个承上启下的阶段,对于确定和控制工程造价、降低业主风险具有特别重要的作用。
Abstract: as a connecting link in the stages of projects, bidding stage has a special important position for the identification and control of project cost and the reduction of risks for the owners.
[摘要]招标阶段作为基建工程一个承上启下的阶段,对于确定和控制工程造价、降低业主风险具有特别重要的作用。
Abstract: as a connecting link in the stages of projects, bidding stage has a special important position for the identification and control of project cost and the reduction of risks for the owners.