采用等刚度法确定换填基础模量;
The replacement foundation modulus was ensured by the method of equivalent-stiffness.
涵管机基础施工,根据图纸计算基础顶标高,按设计及规范要求材料进行换填。
He slipped end-over-end machine foundation construction, according to drawings computing basis, according to the elevation of the top design and specification requirements in fill material.
实践表明,该工程基础超挖换填处理方法操作简单,施工速度快,且造价相对较低,具有较好的实用价值。
Practice shows that, the method of foundation over dig change and fill in the project is easy to operate, quick with less cost, which has a very good and practical value.
本文在分析人工换填地基受力特点的基础上,对其应力分布的计算公式提出了新的建议。
Based on the analysis on the loading specialities of a ground during manual cut and replacement, the paper proposes the new Suggestions on the calculation formulas of the distribution of the stresses.
本文在分析人工换填地基受力特点的基础上,对其应力分布的计算公式提出了新的建议。
Based on the analysis on the loading specialities of a ground during manual cut and replacement, the paper proposes the new Suggestions on the calculation formulas of the distribution of the stresses.