• 承接电气安装拆卸工程

    To undertake the electrical installation and demolition work.

    youdao

  • 蔡素玉议员天星码头钟楼拆卸工程提出项质询。

    Hon choy so-yuk raised a question on demolition project for the old star ferry pier clock tower.

    youdao

  • 初学的汽车工程首先打开他们第一辆车发动机罩,拔出他们的工具,开始拆卸部件以进行清理研究

    Budding automotive engineers start by opening the hood of their first car, pulling out their tools, and removing parts to clean and study.

    youdao

  • 工程师们遥控操作起重机进行拆卸

    Engineers will use remotely operated cranes for the disassembly.

    youdao

  • 为了避免这种威胁巴基斯坦工程师们艰难地外国部件拆卸下来进行复制

    To avoid such threats, Pakistani engineers laboriously disassemble foreign components and replicate them.

    youdao

  • 有些机械工程时间拆卸机器了解最初它们如何组装起来的。

    Some mechanical engineers spend their time disassembling machines to see how they were originally put together.

    youdao

  • 工程项目人员根据阻尼运行工况,每种型号阻尼器任选2台,从现场安装位置拆卸下来性能试验

    According to operational states of damper, project personnel select 2 each type of dampers and take down site installation locations to make performance test.

    youdao

  • 文章就几种应用热胀冷缩进行安装拆卸实例进行分析,叙述其技术要点找出理论估算公式施工前验证工程可行性提供理论依据,有利于提高维修效率

    It narrates the main points of technique, finding out the theoretical estimate formula, providing the theoretical basis for the feasibility of the engineering test and promoting the repair efficiency.

    youdao

  • 买方自行承担工程范围设备瑕疵补救所需拆卸重新组装费用

    The Purchaser shall at his own expense arrange for any dismantling and reassembly of equipment other than the Works, to the extent that this is necessary to remedy the defect.

    youdao

  • 数据信号传输采用一对一寻址RS - 485总线传输,造成工程开工布线工程完工后的拆卸工作繁重,甚至可能引起仪器损坏

    Data acquisition signals are communicated with RS485 bus point to point. As a result, installation and disassembly of instruments become heavy loads, and instruments may be damaged easily.

    youdao

  • 每当需要移动其他网站上脚手架,不需要拆卸系统,而是可以很方便地移动。虽然固定棚架留下个位置是用于建造工程需要一段时间才能完成最好的。

    Bear in mind that you must first know and understand your needs, your workers and your construction project before you make any decision such as choosing the type of scaffolding that you will use.

    youdao

  • 广州市广武人天桥拆除工程地处交通繁忙人流密集地带,受多方条件限制,无法采用传统方法拆卸

    As it's located at a crowded zone with heavy traffic and several restricted conditions, the Guangwu pedestrian overpass in Guangzhou could not be demolished with conventional method.

    youdao

  • 工程就是工程师,其中一个拆卸开来发现里面的零件设计低劣

    Always the engineer, he took one apart and noticed poorly designed parts.

    youdao

  • 所有建造拆卸修复工程在2006年五月完成

    All construction, dismantlement and reinstatement works shall be completed before May 2006.

    youdao

  • 所有建造拆卸修复工程在2006年五月完成

    All construction, dismantlement and reinstatement works shall be completed before May 2006.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定