消能冲刷区采用两岸设置防淘墙而不护底的防护方案。
The scheme of constructing scouring wall for both bank but without bottom protection is designed for dissipation area.
根据河湾迎流顶冲位置和河床冲深,确定护岸范围和优选护岸护底方案。
Based on the scouring position and depth by current in river bend the scope of bank protection and better selection scheme of bank protection are determined.
按结构门径可分为挡土墙、护坡、护岸、护底、护坡护脚、水下抛尸等。
According to the structure of the world can be divided into retaining wall, slope protection, revetment, bottom protection, slope protection spats, underwater cast resin, etc.
综合论述了河流涌潮区段粉砂地基抛石护底防冲保护方案的可行性、经济性和适用性。
It fully discusses the feasibility, economical efficiency and applicability of the scour protection scheme of silt foundation in tidal area.
用软体排护底替代柴排抛石护底在长江口整治中已成为深水航道治理工程中不可替代的材料。
Geotextile mattress has become a necessary material for bed protection during deepwater channel regulation engineering of the Yangtze Estuary regulation project instead of rubble bed protection.
结合某岛礁防波堤护底施工实例,介绍了模袋混凝土技术的施工方法与注意事项,为类似的工程提供参考和借鉴。
This paper takes the works of breakwater apron as an example to introduce the construction technique of bagged concrete and relate the important matters, which will help us with relevant works.
对转炉工艺溅渣护炉中影响底吹的因素进行了分析,通过优化工艺操作取得了良好的底吹透气效果。
This paper analyses the influence factors of bottom blow in the spattering lining protection. Through optimizing the process operation, it achieves good results on bottom blowing.
通过蒸发塔底泵和护进料泵两系统采用变频调速器的数据分析表明,它是提高白土精制装置自动化水平的有效途径。
Applying frequency governor to bottom pump of evaporation tower and feed pump of furnace, the result showed that it is the effective way to improve the automatic level in clay unit.
双复合底护框,以提高灵活性和增加的冲击保护。
Dual compound toe-box for improved flexibility and increased impact protection.
楼四周有四米宽的护楼壕沟,门前设有吊桥通行,其底墙生土掺拌有石灰、红糖,坚固无比。
Around the building is a four-meter-wide trench, in front of which is a suspension bridge, and the bottom wall is the mixture of clay, lime and brown sugar, solid and steady.
楼四周有四米宽的护楼壕沟,门前设有吊桥通行,其底墙生土掺拌有石灰、红糖,坚固无比。
Around the building is a four-meter-wide trench, in front of which is a suspension bridge, and the bottom wall is the mixture of clay, lime and brown sugar, solid and steady.
应用推荐