• 提出地下车库内增设加固方案计算结果显示增设桩基所受上大幅度降低

    The reinforcement scheme which add tension piles and shear walls in the garage was put forward. The calculation results show that the uplift load of the pile greatly reduced after adding shear walls.

    youdao

  • 提出地下车库内增设加固方案计算结果显示增设桩基所受上大幅度降低

    The reinforcement scheme which add tension piles and shear walls in the garage was put forward. The calculation results show that the uplift load of the pile greatly reduced after adding shear walls.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定